BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 12, 2022 at 8:00 PM

Updated September 14, 2023

Site work and new construction of an educational facility in Big Rapids, Michigan. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

**As of July 12 2022, the project has not yet been awarded. A timeline for award has not yet been established.** The board approved budget for the project is $5.5 million. The construction manager shall have complete responsibility for installation ofthe work in accordance with the contract documents to include but not be limited to: site logistics, subcontractor administration, field management, change order management, submittal management, LEED submission & documentation, safety, quality control, scheduling, commissioning coordination, startup, testing, punch-list, warranty, compliance with all applicable Federal, State, Local, University laws, codes, rules and regulations and for all such other matters as may be necessary to produce a complete project. These Design and Construction Standards have been established for Architects and Engineers and other Professionals Service Organizations (PSO) who provide professional design and construction services to Ferris State University. This tool has been developed to economize Facility Management's and other University resources during design phases; the guide is the primary source for developing design and construction documentation. It should be thoroughly reviewed prior to initial meetings with the University. The purpose ofthese standards is to streamline all phases ofwork. By using these standards, the PSO and the University will reduce review time and duplication of resources. This guide has been developed in an effort to ensure that the end result of each project is a high-quality facility that maximizes design esthetic and utility and minimizes maintenance and operating expenses. All deviations from these standards must be reviewed and approved by Ferris State University. Experience and construction developments may lead to revisions ofthe Construction Document Standards. The PSO shall assist the University in updating these documents as part of Project Close-Out. These standards are not meant to be used as specifications, however in some cases supplemental specifications may be provided for project use.

Post-Bid

Educational

$5,500,000.00

Public - State/Provincial

LEED Certification, New Construction, Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
80
Bidding Soon
964
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

August 29, 2022

Project location map

1201 S State St, Big Rapids, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.