BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 8, 2024 at 7:00 PM

Updated February 9, 2024

Site work for a mixed-use development in Spartanburg, South Carolina. Design plans call for site work for a educational facility; and playground / park / athletic field.

As of February 8, 2024, per owner, a design team has been identified. No contractor yet. Contractor bidding August 2024. Project is currently at the end of the design phase, but on hold due to funding. More budget has been requested and hopefully approved in the new fiscal year in July. Construction hopefully September timeframe. Design services to replace an existing synthetic track and replace the natural grass field with an artificial turffield. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Design

Playgrounds / Parks / Athletic Fields

$1,500,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
117
Bidding Soon
1,746
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2024

Project location map

355 Cedar Springs Rd, Spartanburg, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.