BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 9, 2024 at 7:00 PM

Updated February 10, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Pipe Creek Township, Indiana. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of February 9, 2024, an engineer has been selected and this project is in the design phase. It is anticipated bidding will commence in 2027, with construction following. *The closed solicitation has been included below for reference: Miami County Replacement of Bridge 165, CR 300 West over Rife Creek (Des # 2101757) in the Fort Wayne District. This Request for Proposals (RFP) is an official notification of needed professional services. This RFP is being issued to solicit a letter of Interest (LOI) and other documents from firms qualified to perform engineering work on federal-aid projects. A submittal does not guarantee the firm will be contracted to perform any services but only serves notice the firm desires to be considered. Local Public Agency: Miami County Project Location: CR 300 West over Rife Creek Project Description: Replacement of Bridge 165 carrying CR 300 West over Rife Creek. The existing bridge is a two-lane, single span, cast-in-place concrete girder bridge that has advanced deterioration of the concrete beams, superstructure, and substructure. The proposed structure will most likely be a single span structure with a length of approximately 45 feet and a width of 24 feet, including 2 - 10 foot lanes, and 2-foot shoulders. Phases Included: PE, RW Estimated Construction Amount: $766,966 Funding: Federal Funding Involved 80/20 Term of Contract: Until Project Completion DBE goal: 3% The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - Miami County Replacement of Bridge 165, CR 300 West Over Rife Creek

Design

Bridges / Tunnels

$766,966.00

Public - County

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
1
Bidding Soon
813
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2027

Project location map

CR 300 West, Pipe Creek Township, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.