Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 27, 2022 at 8:00 PM
Updated September 14, 2023
Site work and paving for a road / highway in Dunbar, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.
As of June 27 the project was awarded to Scott Construction Inc, no awarded amount available.. Notice is hereby given by the Dunbar Town Board that it will receive sealed bids for: Lily Lake Rd (starting at Trout Haven heading North) Either Cold Mix Asphalt or Hot Mix Asphalt Approximately 1,860 feet (from intersection to bridge) X 20 feet Bids must include: All traffic control for the project. Fine grading, water and compaction for hot mix asphalt or cold mix asphalt Paving a 2" compacted hot/cold mix asphalt pavement. Material must be made in computerized mixing plant, hauled, placed with paver, and compacted with roller Asphalt must be SS3 or CM-3500 Total cost for project must include price per ton Lily Lake Rd (starting at 100 feet south of pike plains heading North) Either Cold Mix Asphalt or Hot Mix Asphalt Approximately 2,200 feet X 20 feet Bids must include: All traffic control for the project. Fine grading, water and compaction for hot mix asphalt or cold mix asphalt Paving a 2" compacted hot/cold mix asphalt pavement. Material must be made in computerized mixing plant, hauled, placed with paver, and compacted with roller Asphalt must be SS3 or CM-3500 Total cost for project must include price per ton The Town Board of Dunbar reserves the right to reject any or all bids and to accept the bid most advantageous to the town.
Award
Roads / Highways
$2,000,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 7, 2022
August 8, 2022
Lily Lake Rd, Dunbar, WI
Related To This Project
Dunbar, WI
Bid Date: Apr 08 2025
La Crosse, WI
--
Viola, WI
Bid Date: Jun 16 2022
Grand Chute, WI
Bid Date: Jun 23 2021
Milwaukee, WI
Bid Date: Jun 23 2022
Eau Claire, WI
Bid Date: Jun 14 2022
Weston, WI
Bid Date: Jun 09 2022
Weston, WI
Bid Date: Jun 09 2022
Weston, WI
Bid Date: Jun 09 2022
Stoughton, WI
--
Rice Lake, WI
Bid Date: Jun 13 2022
Rice Lake, WI
Bid Date: Jun 13 2022
Milwaukee, WI
--
De Pere, WI
Bid Date: Jun 02 2022
Johnson Creek, WI
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
