BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Dunbar, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of June 27 the project was awarded to Scott Construction Inc, no awarded amount available.. Notice is hereby given by the Dunbar Town Board that it will receive sealed bids for: Lily Lake Rd (starting at Trout Haven heading North) Either Cold Mix Asphalt or Hot Mix Asphalt Approximately 1,860 feet (from intersection to bridge) X 20 feet Bids must include: All traffic control for the project. Fine grading, water and compaction for hot mix asphalt or cold mix asphalt Paving a 2" compacted hot/cold mix asphalt pavement. Material must be made in computerized mixing plant, hauled, placed with paver, and compacted with roller Asphalt must be SS3 or CM-3500 Total cost for project must include price per ton Lily Lake Rd (starting at 100 feet south of pike plains heading North) Either Cold Mix Asphalt or Hot Mix Asphalt Approximately 2,200 feet X 20 feet Bids must include: All traffic control for the project. Fine grading, water and compaction for hot mix asphalt or cold mix asphalt Paving a 2" compacted hot/cold mix asphalt pavement. Material must be made in computerized mixing plant, hauled, placed with paver, and compacted with roller Asphalt must be SS3 or CM-3500 Total cost for project must include price per ton The Town Board of Dunbar reserves the right to reject any or all bids and to accept the bid most advantageous to the town.

Award

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
3
Bidding Soon
115
All Active Projects
53
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2022

August 8, 2022

img_map_placeholder

Lily Lake Rd, Dunbar, WI


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.