BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Marion, Indiana. Completed plans call for site work for a water / sewer project.

No conditional bids will be considered. The work for which Proposals are to be received: C.I.P.P. SEWER MAIN REHABILITATION PROJECTS Project 10-22-09 City Wide Storm Lining Project 04-22-11 City Wide Sanitary Sewer Lining The work consists of the rehabilitation of approximately 512 feet of 54-inch sewer main using C.I.P.P., 195 feet of 36-inch sewer main using C.I.P.P., 245 feet of 27-inch sewer main using C.I.P.P., 2,002 feet of 15-inch sewer main using C.I.P.P, 854 feet of 12-inch sewer main using C.I.P.P., 1,207 feet of 10-inch sewer main using C.I.P.P., 2,527 feet of 8-inch sewer main using C.I.P.P., and all appurtenances necessary to complete the sewer main rehabilitation work as shown on the drawings and as specified. Proposals shall be properly and completely executed on the standard Proposal Form obtainable from the office of the Engineer, with fully executed Non-collusion Affidavit required by the statutes of the State of Indiana. Form 96, Contractors Bid for Public Works, shall accompany all bids as prescribed by the Indiana State Board of Accounts. Any proposal not accompanied by the above required items may be deemed to be a non-responsive bid by the Owner. No consideration for escalation of prices can be considered, and therefore contractors are advised not to include any such escalation clauses in their proposals for this project. No bidder may withdraw his Proposal within a period of 60 days following the date set for receiving Proposals. The Utility Service Board reserves the right to retain any and all Proposals for a period of not more than 90 days, and said Proposals shall remain in full force and effect during said time. The Marion Utility Service Board further reserves the right to waive informalities and to award the contract to the lowest and most responsible bidder or bidders, all to the advantage of the Marion Utility Service Board, or to reject all Proposals.

Post-Bid

Water / Sewer

$3,205,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
47
Bidding Soon
884
All Active Projects
346
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2022

August 15, 2022

img_map_placeholder

Multiple Locations, Marion, IN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.