Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 28, 2024 at 8:00 PM
Updated October 1, 2024
Site work, paving and new construction of a mixed-use development in West Palm Beach, Florida. Working plans call for the construction of a municipal facility; for site work for a municipal facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The owner has determined a prequalified list of construction managers. **As of March 28, 2024, selection has not been made yet. A timeline for award has not yet been established. The respondents will be submitting proposals to provide Construction Management at Risk services consisting of pre-construction services, developing a Guaranteed Maximum Price (GMP), and construction of the following project 45th Street Complex located at 4200 North Australian Avenue, WPB (the Project). The Project includes but is not limited to: Site Work: The total property, consisting of five adjoining parcels, totals approximately 41.39-acres. Site clearing and infrastructure improvements are required for a portion of the site in order to add a new approximately 60,000 s.f. Community Services building and required site amenities to include right-of-way improvements and road access into the site from Australian Avenue. The completed project will require surface parking for the Community Services building as per code requirements. Additional future improvements to the site (not part of this project) will include a 2-level parking structure and approximately 350,000 s.f. governmental use facility. The project will include all related infrastructure and site work development required to support the new Community Services building without compromising the ability to retain all existing improvements in service and realize the future delivery of the approximately 350,000 s.f. facility for future government office and support space. Construction of the 350,000 s.f. facility for government office and support space are not included in the scope of this RFP. Community Services Office Building: The Community Services Office Building is to consist of a two (2) level approximately 60,000 s.f. stand-alone building structure. The exterior of the building will be constructed of traditional reinforced CMU with painted stucco finish and a flat built up roof. The building will include impact rated doors and windows. The building program requires that this building be on emergency generator and include a loading dock area with dock leveler, overhead coiling door and an enclosed chain link area for secure storage.
Final Planning
Municipal
$22,000,000.00
Public - County
New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 11 - Equipment
Division 27 - Communications
Division 34 - Transportation
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 9, 2023
February 1, 2025
45th St, West Palm Beach, FL
Related To This Project
West Palm Beach, FL
Bid Date: Dec 15 2022
West Palm Beach, FL
--
West Palm Beach, FL
Bid Date: Dec 21 2022
West Palm Beach, FL
--
West Palm Beach, FL
Bid Date: Jun 14 2022
West Palm Beach, FL
Bid Date: Jun 17 2022
West Palm Beach, FL
--
West Palm Beach, FL
Bid Date: Oct 15 2019
West Palm Beach, FL
Bid Date: May 06 2022
West Palm Beach, FL
Bid Date: Jun 13 2022
West Palm Beach, FL
Bid Date: Feb 07 2025
West Palm Beach, FL
Bid Date: Jun 10 2022
West Palm Beach, FL
Bid Date: May 03 2022
West Palm Beach, FL
Bid Date: Jun 09 2022
West Palm Beach, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.