Published August 1, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Shiloh, Pennsylvania. Completed plans call for site work for a water / sewer project.

The Work to be performed for the Haviland Road Sewer Extension Project involves obtaining all materials and completing all work related to the construction of sanitary sewer extensions beneath Haviland Road and an unnamed alley from an existing sewer beneath Brougher Lane as detailed in the contract documents. The project includes, but is not limited to, earth work, rock removal, utility relocation, manhole installation, sewer pipe installation, and site restoration. Maps and plans have been included on the Penn BID website defining the project area. The construction easements required for this project will be secured by the Township prior to the notice to proceed. This construction project is financed by a grant from the Commonwealth of Pennsylvania, Commonwealth Financing Authority (CFA) and must comply with PA Small Water and Sewer Program guidelines. Work must be performed to ensure that non-discrimination/sexual harassment provision of the contract documents and the CFA are met. The work shall also conform to the requirements of the Pennsylvania Prevailing Wage Act. West Manchester Township, in accordance with Title VI of the U.S. Civil Rights Act of 1964 and Parts 21 and 23 of 49 C.F.R., notifies all respondents that it will affirmatively ensure that MBE/WBE will be afforded full opportunity to submit proposals in response to this invitation and that no person will be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award. The time for completion of the work of this contract is 120 days from the issuance of the notice to proceed. The Owner hereby reserves the right to reject any and/or all proposals submitted. The Owner also reserves the right to waive any defects, errors, omissions, irregularities, or informalities in the proposals received. Questions submitted after 5:00 PM on June 8, 2022, will not be answered. Contract Time: 100 calendar days

Award

Water / Sewer

$478,461.00

Public - City

Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
131
Bidding Soon
2,151
All Active Projects
1,067
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2022

July 15, 2022

img_map_placeholder

Haviland Rd, Shiloh, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Haviland Road Sewer Extension Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.