Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Winnipeg, Manitoba. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The Work to be done under the Contract shall consist of two parts: (a) Part 1 - City Funded Work (b) Part 2 - Manitoba Hydro Funded Work Part 1 - City Funded Work shall consist of: (a) Concrete Pavement Reconstruction (i) University Crescent Northbound from Thatcher Drive to Pembina Highway (b) Pavement Rehabilitation (i) University Crescent Southbound from Thatcher Drive to Pembina Highway (c) Traffic Signal Conduit and Base Installation and Associated Works (i) University Crescent Pedestrian Corridor at Thatcher Drive (ii) University Crescent Pedestrian Corridor at Wedgewood Drive (iii) University Crescent and Pembina Highway Intersection (d) Water and Waste Work (i) University Crescent from Thatcher Drive to Pembina Highway Part 2 - Manitoba Hydro Funded Work shall consist of: (a) Street Lighting Installation and Associated Works (i) University Crescent Northbound from Thatcher Drive to Pembina Highway The City currently has no approved funding in the Capital Budget for Part 2 of the Work, but is anticipating receiving notification about funding from Manitoba Hydro by late June 2022. Part 2 of the Work is contingent upon Manitoba Hydro approving sufficient funding. Official bid documents must be obtained from Merx and bid submissions must be done through the Merx platform.
Award
Roads / Highways
$3,821,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 21, 2022
July 20, 2022
Multiple Locations, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Jul 12 2022
Winnipeg, MB
Bid Date: Jun 10 2022
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Jul 14 2022
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Jul 19 2022
Winnipeg, MB
Bid Date: Jun 30 2022
Winnipeg, MB
Bid Date: Jul 14 2022
Winnipeg, MB
Bid Date: Jun 14 2022
Winnipeg, MB
Bid Date: May 10 2022
Winnipeg, MB
Bid Date: Apr 26 2022
Winnipeg, MB
Bid Date: Jul 14 2022
Winnipeg, MB
Bid Date: Jul 14 2022
Winnipeg, MB
--
Winnipeg, MB
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.