Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Pierre, South Dakota. Completed plans call for site work for a bridge / tunnel; transportation facility; for paving for a transportation facility; and for outdoor lighting for a transportation facility.
Rehabilitate Runway 7-25. Work items include but are not limited to asphalt pavement milling, asphalt pavement removal, earthwork, asphalt paving, pavement marking, erosion control, seeding, electrical removals, electrical installations, chain-link fence removal, chain-link fence installation, culvert installation, gravel/millings road grading, NAVAID removals, and NAVAID installations. Each bid in excess of $50,000.00 shall be accompanied by either a certified check, cashier's check or draft in a sum equal to five percent (5%) of the maximum bid price and drawn on a State or National Bank or a bid bond in a sum equal to ten percent (10%) of the maximum bid price executed by the Bidder as principal and by a surety company authorized to do business in the State of South Dakota, payable to the City of Pierre, conditioned that if the principal's bid be accepted and the contract awarded to him, he, within ten (10) days after Notice of Award has been executed, will execute and effect a contract in accordance with the terms of his bid and a contractor's bond as required by law and regulations and determinations of the governing board. The bid security of the two lowest bidders will be retained until the Notice of Award has been executed, but no longer than sixty (60) days. The bid security is a guarantee that the bidder will enter into contract for work described in the Proposal.The successful Bidder will be required to furnish a Contract Performance Bond, a Payment Bond in the full amount of the Contract, and proof of Contractor's Excise Tax License. Goals for minority participation for each trade: 7.9% Goals for female participation in each trade: 6.9%.Contact KLJ at 701-355-8400 if you have any questions. The City of Pierre reserves the right to hold all bids for a period of 60 days after the date fixed for the opening thereof to reject any and all bids and waive defects and to accept any bids should it be deemed for the public good and also reserves the right to reject the bid of any party who has been delinquent or unfaithful in the performance of any former contract to the Owner. Phase 3 shall be completed after Phase 1 and Phase 2 have been completed and between September 10, 2023 and September 15, 2023 Goals for minority participation for each trade: 7.9% Goals for female participation in each trade: 6.9% The Disadvantaged Business Enterprise (DBE) goal for this project is 9.71 percent
Bid Results
Transportation Terminals
$6,510,854.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 16, 2022
August 15, 2022
3800 Airport Rd, Pierre, SD
Related To This Project
Pierre, SD
Bid Date: Dec 03 2020
Pierre, SD
Bid Date: Feb 20 2020
Pierre, SD
Bid Date: Sep 08 2022
Pierre, SD
Bid Date: Aug 30 2022
Pierre, SD
Bid Date: Apr 26 2023
Pierre, SD
Bid Date: Sep 21 2022
Pierre, SD
Bid Date: May 13 2021
Pierre, SD
Bid Date: Aug 24 2022
Pierre, SD
Bid Date: Aug 23 2022
Pierre, SD
Bid Date: Aug 11 2022
Pierre, SD
Bid Date: Aug 18 2022
Pierre, SD
Bid Date: Jul 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.