BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 2, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Bakersfield, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Paving hot mix asphalt, constructing concrete sidewalk, median, drive approach, curb ramp, curb and gutter, installing traffic signal system, and painting thermoplastic traffic stripes and pavement markings License Type Required: A, C-8, C-12 Email request for clarification or interpretation to Angela Willis at WillisA@kerncounty.com. Requests must be received at least 5 business days prior to bid opening. Liquidated Damages: $2,000.00 Per Calendar Day Project Duration: 75 Work Days Bid Bond Percentage: 10% The County reserves the right to reject any and all bids.

Bid Results

Roads / Highways

$1,209,306.00

Public - County

Paving, Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
45
Bidding Soon
765
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2022

August 29, 2022

Project location map

Calloway Dr, Bakersfield, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.