EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 2, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in San Diego, California. Contact the soliciting agency for additional information.

Response Format Electronic Project Type Bid Response Types Line Items Type of Award Lump Sum License Requirements A Bid Valid 120 Calendar Days Liquidated Damages Refer to Solicitation Document Project Duration 2 years for issuance of Task Orders Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Pre-Bid Meeting No Online Q&A No SCOPE OF WORK: PIPELINE Work will include a variety of detailed repair and construction tasks and specifications that have pre-established unit prices listed in a Unit Price Book (UPB). The UPB pricing incorporates the use of experienced labor, high quality materials, local activity, climate, and geographic factors. All Work pursuant to this Contract will be performed for the City of San Diego. The Work will involve the repair, alteration, modernization, maintenance, rehabilitation, reconstruction, or construction of City streets, utilities and other Right of Way Pipeline included in a JOC Task Order RFP. 1.1. The Contractor shall furnish all management, documentation, design, and incidental drawings (as required), labor, materials, and equipment needed to perform the Work. 1.2. The Work shall be performed in accordance with the JOC Task Order RFP Scope of Work and other requirements. Other Details Contractor and Subcontractor Registration Requirements. This project is subject to compliance monitoring and enforcement by the DIR. A contractor or subcontractor shall not be qualified to bid on, be listed in a bid or proposal, subject to the requirements of section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Labor Code section 1725.5 It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. 1.9.1. A Contractor's inadvertent error in listing a subcontractor who is not registered pursuant to Labor Code section 1725.5 in response to a solicitation shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive provided that any of the following apply: (1) the subcontractor is registered prior to bid opening; (2) within twenty-four hours after the bid opening, the subcontractor is registered and has paid the penalty registration fee specified in Labor Code section 1725.5; or (3) the subcontractor is replaced by another registered subcontractor pursuant to Public Contract Code section 4107. 1.9.2. By submitting a bid or proposal to the City, Contractor is certifying that he or she has verified that all subcontractors used on this public work project are registered with the DIR in compliance with Labor Code sections 1771.1 and 1725.5, and Contractor shall provide proof of registration for themselves and all listed subcontractors to the City at the time of bid or proposal due date or upon request. Notes SUBCONTRACTING PARTICIPATION PERCENTAGES: 25.1. The City has incorporated a voluntary mandatory subcontractor participation percentage to enhance competition and maximize subcontracting opportunities. 25.2. The mandatory subcontracting percentage is 10% for SLBE-ELBE firms, unless specified otherwise by the Task Order RFP. 25.3. Task Order costs, without Field Order amounts, will be included in the calculation. 25.4. The Contractor shall maintain a participation level at or above the mandatory percentage continuously throughout the term of the contract. 25.5. The Contractor shall submit as requested, during the term of the contract, a subcontractor participation report as required by the City detailing the participation levels for each certification and overall by each Task Order and overall contract.

Post-Bid

Pipeline

$40,000,000.00

Public - City

Service, Maintenance and Supply

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Reference Standards, Execution and Closeout Requirements, Examination and Preparation
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
36
Bidding Soon
744
All Active Projects
327
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2022

August 10, 2022

img_map_placeholder

Multiple Locations, San Diego, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.