BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Baker, Louisiana. Completed plans call for the renovation of a municipal facility.

City of Baker (Herein Referred to as the Owner) Hereby Solicits Sealed Bids for the Municipal Complex Generator Replacement Project Described as Follows: Statement of Work: Modifying the Existing 120/208v Three-phase Service as Shown on the Drawings, Including Coordinating With Entergy. Demolishing the Existing Natural Gas Generator and Demolishing the Existing Conductors. Demolishing the Existing 500a Panels and Replacing With New Panels as Shown on the Drawings, Including Tracing the Existing Circuits and Demolishing Existing Abandoned Circuits. Furnishing and Installing Conduits With Conductors From Service Entrance Service Equipment to the Building as Shown on the Drawings. Furnishing and Installing Power Panels and Disconnect Switches for Use Within Buildings. Furnishing and Installing Electrical Conduit and Wiring Required for Connection of Mechanical Equipment Furnished Under Other Sections of These Specifications. Furnishing and Installing a New 200 Kw Natural Gas Generator as Shown on the Drawings. Furnishing and Installing a New Automatic Transfer Switch as Shown on the Drawings. Installation of Temporary Construction Power Required by the General Contractor and Sub-contractors During the Construction Period. Contractors Submitting Bids Shall Be Licensed Under La R.s. 37:2150-2164, Electrical Work. The Bidder Shall Show His License Number on the Bid and on the Sealed Envelope Submitting the Bid. The Owner Reserves the Right to Reject Any and All Bids for Just Cause; Such Actions Will Be in Accordance With Title 38 of the Louisiana Revised Statutes. In Accordance With R.s. 38:2212 (a)(1)(B), the Provisions and Requirements Stated in the Bidding Documents Shall Not Be Waived by Any Entity. Each Bidder Must Deposit With His/her Bid, Security in the Amount of at Least Five Percent (5%) of the Total Bid Price, Provided on the Specified Form and Subject to the Conditions Provided in the Information for Bidders. Sureties Used for Obtaining Bonds Must Appear as Acceptable on the U. S. Department of Treasury Circular 570. No Bidder May Withdraw His/her Bid Within Forty-five (45) Days After the Actual Date of the Opening Thereof.

Post-Bid

Municipal

$100,000.00

Public - City

Renovation

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
109
Bidding Soon
1,288
All Active Projects
679
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 30, 2022

August 1, 2022

August 16, 2023

img_map_placeholder

To Be Determined, Baker, LA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.