BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a civil project in Morrison, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

Region: 1 Counties: Jefferson Contract UDBE Goal: 10.00% Project scope is to resurface EB and WB I-70 from Chief Hosa (MP 252.4) to Colfax (MP 258.7). The resurfacing project will include mill and fill, guardrail improvements, erosion control, and signing and striping. Bridge deck repair is planned for the bridge at the eastern extent of the project (MP 258.7) Additionally, the project will implement safety strategies defined in the I-70 EB Active Traffic Management (ATM) Concept of Operations, including Variable Speed Limit (VSL) signs, Variable Message Signs (VMS), Microwave Vehicle Radar Detection (MVRD), friction sensors, and sign installations on EB I-70 between Genesee (MP 253) and Colfax Ave (MP 262). A mandatory pre-bid conference/meeting will held April 15th 2024 at 9:00 am at 425A Corporate Circle, Golden, CO 80401. This project is located in Region 1 in Jefferson County. Project work consists of resurfacing of both east and westbound I-70 from Chief Hosa to Colfax. Work may also include mill and fill, guardrail improvements, erosion control, and signing and striping. Bridge deck repair is planned for the bridge at MP 258.7. Additionally, the project will implement safety strategies defined in the I-70 EB Active Traffic Management (ATM) Concept of Operations. Please contact Cody Daigneault at 720-497-6927 for all project related questions. Work Days: 320 It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 ( ) Between $1,000,000 and $5,000,000 ( ) Between $5,000,000 and $20,000,000 (X) Greater than $20,000,000 CODOT: 004 - Region 1 - I-70 Resurfacing *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project scope is to resurface EB and WB I-70 from Chief Hosa (MP 252.4) to Colfax (MP 258.7). The resurfacing project will include mill and fill, guardrail improvements, erosion control, and signing and striping. Bridge deck repair is planned for the bridge at the eastern extent of the project (MP 258.7). Additionally, the project will implement safety strategies defined in the I-70 EB Active Traffic Management (ATM) Concept of Operations, including Variable Speed Limit (VSL) signs, Variable Message Signs (VMS), Microwave Vehicle Radar Detection (MVRD), friction sensors, and sign installations on EB I-70 between Genesee (MP 253) and Colfax Ave (MP 262). Questions received from bidders along with CDOT responses will be posted on the CDOT web site listed below as they become available. http://www.coloradodot.info/business/bidding/future-bidding-opportunities All questions shall be directed to the CDOT contacts listed above no later than 7:00 A.M. Monday of the week of bid opening. Final questions and answers will be posted no later than Tuesday morning of bid opening week. Questions and answers shall be used for reference only and shall not be considered part of the Contract.

Award

Roads / Highways

$34,726,159.00

Public - State/Provincial

Paving, Site Work

493

5

114

9

Subscribe For Documents

156 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
57
Bidding Soon
1,009
All Active Projects
418
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2024

July 9, 2024

img_map_placeholder

Interstate 70, Morrison, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.