BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 16, 2022 at 8:00 PM

Updated September 14, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Lincoln, Kansas. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The project consists of removing the existing bridge and replacing it with a 45' steel beam bridge with a corrugated metal deck over Spring Creek Located 4.0 miles south and 3.4 miles east of Vesper along Hawk Drive over Spring Creek. Pre-Qualification: Yes Work will commence no sooner than the date of the signed contract (earliest start date) and no later than March 1, 2023 (late start date). All work shall be completed within 65 calendar days after the Notice to Proceed

Award

Bridges / Tunnels

$313,877.00

Public - County

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
24
Bidding Soon
242
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2022

March 1, 2023

Project location map

Multiple Locations, Lincoln, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.