BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2023 at 8:00 PM

Updated January 26, 2024

Site work, paving and renovation of a mixed-use development in Shelley, Idaho. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for the renovation of a water / sewer project; and water / sewer project.

EIRWWA desires to select a CM/GC to provide pre-construction and construction services for upgrades to its Oxbow Water Reclamation Facility (WRF) located west of Shelley, Idaho in Bingham County adjacent to the Snake River. Facilities to be upgraded will generally include the influent pump station, headworks, biological basins, and membrane bioreactor system with associated yard piping, sitework, building, electrical, and control improvements. EIRWWA anticipates conducting the solicitation in up to two phases - the SOQ Phase and the Interview Phase (at Owner's discretion). For the SOQ Phase, written SOQs will be solicited and evaluated based on this RFQ and in accordance with Idaho Statutes Title 67 - State Government and State Affairs, Chapter 23 - Miscellaneous Provisions, Section 67-2320 - Professional Service Contracts with Design Professionals, Construction Managers, and Professional Land Surveyors. EIRWWA anticipates conducting the solicitation in up to two phases - the SOQ Phase and the Interview Phase (at Owner's discretion). For the SOQ Phase, written SOQs will be solicited and evaluated based on this RFQ and in accordance with Idaho Statutes Title 67 - State Government and State Affairs, Chapter 23 - Miscellaneous Provisions, Section 67-2320 - Professional Service Contracts with Design Professionals, Construction Managers, and Professional Land Surveyors. The CM/GC services will consist of two phases: Phase 1 - Preconstruction Phase Services; and Phase 2 - Construction Phase Services (if authorized to proceed by Owner). Questions about the Project or RFQ must be submitted via email to the following point-of-contact by the date and time listed in the schedule: Levi Shoolroy, P.E., Lead Engineer, J-U-B ENGINEERS, Inc. / (208) 762-8787 / lshoolroy@jub.com EIRWWA reserves the right not to select any firm for the services based on this RFQ, to accept or reject any or all submittals, or to cancel, at its discretion, this RFQ at any time and for any reason. Also, if the Project cannot be delivered within the allocated budget and/or schedule, Owner retains the option to cancel the Project, reduce the scope, or deliver the Project by other means.

Award

Water / Sewer

$1,500,000.00

Public - State/Provincial

Paving, Renovation, Site Work

634

17

3

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
18
Bidding Soon
186
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2022

November 14, 2022

Project location map

To Be Determined, Shelley, ID

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.