BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Trenton, Wisconsin. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Approximate quantities are as follows: Excavation Common 17,500 CY Base Aggregate Dense 11,200 TON Breaker Run 4,750 TON HMA Pavement 6,700 TON Culvert Pipes 750 LF Storm Sewer 50 LF Concrete Curb & Gutter 1,250 LF Topsoil & Salvaged Topsoil 22,000 SY Epoxy Pavement Markings 19,000 LF Bid Bond (Required) - No bid shall be received unless accompanied by a certified check or bid bond equal to five (5%) percent of the bid, payable to Washington County Treasurer, as a guarantee that if the bid is accepted, the successful bidder will execute and file the contract within ten (10) days after the award of the contract. If you are submitting a 5% certified check in lieu of the bid bond, include a completed and signed copy of your firm's current W-9 Form with your sealed bid. In case the bidder fails to file such contract, the amount of the check or bid bond shall be forfeited and become the property of Washington County. Failure to submit the required bid security as part of the firm's sealed bid will result in immediate rejection of the firm's bid. The accepted bidder will also be required, as a condition precedent to award of contract, to furnish in the amount of 100% of the contract price, satisfactory Performance & Payment Bonds and Certificate of Insurance. Bids shall be submitted on the bid form provided and all blanks must be filled in for the bid to be accepted. No bid may be withdrawn for a period of 60 days from the date of the bid opening. The project is expected to be awarded July 5, 2022 and shall be substantially completed by October 14, 2022 and shall be fully completed by October 28, 2022. Construction time is of the essence. Completion delays are subject to liquidated damages.

Award

Roads / Highways

$1,676,628.00

Public - County

Paving, Site Work

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
52
Bidding Soon
845
All Active Projects
349
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2022

July 5, 2022

img_map_placeholder

Co Trunk Hwy M, Trenton, WI

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.