BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in East Palo Alto, California. Completed plans call for site work for a playground / park / athletic field.

Contractor shall perform the Work at Duveneck Elementary School (705 Alester Ave. Palo Alto, CA 94303), Ohlone Elementary School (950 Amarillo Ave., Palo Alto, CA 94303), and Fairmeadow Elementary School (500 E. Meadow Dr., Palo Alto, CA 94303) ("Site"). Repairing, cleaning, and patching of the existing 6384 sq. ft. pour-in-place rubber surfacing under the playground, and. Provide and install new Ameriturf Playground synthetic turf (or equal) over the existing 6384 sq. ft. (133' x 48'2") pour-in-place rubber surfacing; including infill and brushing. PREVAILING WAGE LAWS: The successful Bidder and all subcontractors shall pay all workers for all Work performed pursuant to this Contract not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations, State of California, for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to 1770 et seq. of the California Labor Code. This Project is subject to labor compliance monitoring and enforcement by the Department of Industrial Relations pursuant to Labor Code 1771.4 and subject to the requirements of Title 8 of the California Code of Regulations. The Contractor and all Subcontractors under the Contractor shall furnish electronic certified payroll records directly to the Labor Commissioner weekly and within ten (10) days of any request by the District or the Labor Commissioner. The successful Bidder shall comply with all requirements of Division 2, Part 7, Chapter 1, Articles 1-5 of the Labor Code, and is required to be registered as a public works contractor with the Department of Industrial Relations pursuant to the Labor Code. June 14, 2022 - Award-Tentative, pre-con meeting June 29, 2022 - NTP onsite start - 30 calendar day duration July 29, 2022 - Final Completion

Award

Playgrounds / Parks / Athletic Fields

$71,820.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
73
Bidding Soon
1,561
All Active Projects
657
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2022

July 13, 2022

img_map_placeholder

950 Amarillo Ave, East Palo Alto, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.