Site work for a water / sewer project in Manchester, New Hampshire. Completed plans call for site work for a water / sewer project.

The City of Manchester is seeking prequalification statements from construction contractors for a pipeline cleaning and retrofit project: The Cemetery Brook CSO Optimization with Real-Time Controls (RTC) Project, Contract 1. The project is scheduled to begin construction in fall of 2022. The Cemetery Brook CSO Optimization with Real-Time Controls Project, Contract 1 includes cleaning and maintenance of the Valley Street Cemetery conduits, modification of the Cemetery Brook Primary CSO regulator, construction of a new Cemetery Brook dry weather flow regulator structure with local reactive passive control, and implementation of an extended reactive RTC at West Side Pump Station. Construction duration is 348 calendar days for substantial completion and 408 calendar days for final completion. The Cemetery Brook CSO Optimization with Real-Time Controls Project, Contract 1, takes place along approximately one mile of reinforced concrete storm drain and connect to the East Interceptor North (EIN). It includes the construction and installation of a new Dry Weather Flow (DWF) regulator structure with local reactive passive control at the outlet of Cemetery Brook's 30-inch DWF pipe, at a depth ranging from 15 to 25 feet. Contract 1 also includes raising the elevation of the 32-foot overflow weir crest of Cemetery Brook's Primary Regulator structure by 1.12 feet. Debris removal from the 1200 linear foot of 10' x 4' double box culvert at Valley Street Cemetery will also be required. Finally, the West Side Pump Station will be modified to incorporate extended reactive real-time controls (RTC). Mandatory pre bid conferences will be held approximately two weeks prior to bid opening. Construction contractors with extensive experience in sanitary and storm drain construction projects of a similar size and scope are invited to submit prequalification statements for bidding on the City of Manchester's Cemetery Brook Combined Sewer Optimization with Real-Time Controls Project, Contract 1. Prequalification forms for construction contractors may be obtained from Brown and Caldwell by contacting Colin O'Brien at cobrien@brwncald.com. Questions regarding the pre-qualification forms may also be directed to Colin O'Brien at the email address above or at (978) 906-1382. The right is reserved to waive any informalities in or reject any or all prequalifying Contractors and to accept prequalified Contractors that are deemed most favorable to the interest of the City of Manchester. Question Deadline 07/10/2022 at 4:00 PM ET please submit them via email to cobrien@brwncald.com *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Award

Water / Sewer

$2,155,119.00

Public - City

Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing Laboratory Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Commissioning
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 08 - Openings

Division 08 - Openings

Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
251
Active Projects
134
Bidding Soon
2,575
All Active Projects
1,148
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2022

October 17, 2022

img_map_placeholder

Multiple Locations, Manchester, NH


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

CSO Optimization With Real Time Controls

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.