BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Telluride, Colorado. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

This Request for Documented Quotations (DQ) is issued by the State of Colorado, acting by and through the Department of Natural Resources, Division of Reclamation, Mining and Safety (DRMS). Enclosed is a brief description and bid schedule for the Matterhorn Mill Wetlands Project In 2021, work was completed to place mill tailings associated with the Matterhorn Mill into an onsite repository. A drainage ditch (approximately 5 feet wide and 2 feet deep, with 2 feet of rock in the bottom) was constructed around the perimeter of the repository. Approximately 250 feet of the ditch immediately abuts an existing wetland. To avoid inadvertent draining of the adjacent wetland, this project will install four ditch blocks. A low-flow notch will also be installed in the ditch to allow surface flows (snowmelt and other precipitation) to spill out of the ditch into an area of wetlands. Additionally, the access road to the repository will be reclaimed as part of this project. The repository access road was constructed through a small section of wetlands. Two layers of geogrid were placed over the wetland area and 3 to 4 feet of coarse rock and gravel were placed to allow heavy equipment to pass without compaction of wetlands soils. The materials used for the wetlands crossing will be removed and placed onsite and the liner material separated and placed onsite. Bidding documents must be obtained prior to the pre-bid meeting. Any Documents that cannot be loaded to the VSS System are the ONLY documents that will be distributed at the Pre-Bid Meeting. For projects exceeding $150,000, the successful proposer(s), hereafter called Contractor, will be required to enter into a formal contract with the State. The contract will incorporate this DQ, published addenda, and the response of the successful bidder, and will include all contract terms and the Colorado Special Provisions. The project is scheduled for construction between August 1, 2022 and August 31, 2022. This includes ten (10) days mobilization time. These dates are tentative and may change. The time of completion allowed for the project is 30 calendar days after receipt of the Notice to Proceed. This includes ten (10) days mobilization time. The Principal Representative shall be entitled to reject any claim for extra cost whenever the foregoing procedure is not followed.

Award

Water / Sewer

$29,445.00

Public - State/Provincial

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
12
Bidding Soon
162
All Active Projects
70
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 6, 2022

July 14, 2022

August 15, 2022

img_map_placeholder

Multiple Locations, Telluride, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.