Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Suttons Bay, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Said Drain is in two (2) Sections as follows, each section having the length, average depth and width as set forth: Section 1: Enclosed storm drain construction, beginning at East Fouch Road, as shown on the Drawings, beginning at Station 0+30 and ending at Station 16+70, and beginning at Lake Bluffs Drive, at South Lake Court, beginning at Station 100+30 and ending at Station 106+00, with an average depth of cut being 4.5 feet and ranging from 3.5 feet to 7.5 feet in depth. Enclosed storm drain construction is not along entire lengths of stationing, but rather staggered throughout road, with a mix of crossing roadway and running along roadway. Section 2: Open storm drain construction of ditches and infiltration basins, along both Lake Bluffs Drive and South Lake Court, as shown on the Drawings, with an average depth of cut being 4 inches and ranging from 0 inches to 12 inches in cut depth for ditch construction and average depth of cut being 2.5 feet and ranging from 0.5 feet to 3.5 feet in cut depth for infiltration basins. The average dimensions of each infiltration basin being 30 feet by 45 feet. The following items of work are viewed as the major items of work comprising the construction of the Lake Bluffs Drain. The quantities associated with the items of work are approximate and final payment will be made based upon final installed and measured quantities: Install 1465 LF of 12" RCP Storm Sewer Install 65 LF of 15" RCP Storm Sewer Install 64 LF of 12" Dual Wall Perforated HDPE Storm Sewer Install 165 LF of 12" CSP Storm Sewer Install 30 LF of 15" CSP Storm Sewer Install 21 - 2-ft. dia. HDPE Storm Sewer Structure Install 17 - 4-ft. dia. Storm Sewer Structure Install 1 - 5-ft. dia. Storm Sewer Structure Install 17 - 12" RCP F.E.S. Install 2 - 15" RCP F.E.S Install 12 - 12" CSP F.E.S. Install 2 - 15" CSP F.E.S Install 1358 Tons of 3" HMA Road Restoration Install 150 Tons of HMA Valley Gutter Curb Install 102 LF of Concrete Curb and Gutter, Type B2 Install 354 SYD of HMA, Driveway Restoration Install 60 SYD of Concrete, Driveway Restoration Install 103 SYD of Gravel, Driveway Restoration Install 1056 SYD of Infiltration Basin Install 1147 LF of Ditch Grading/Construction Install 124 LF of 12" Trapezoidal Smart Ditch Install 52 EA of Check Dams Install 51 EA of Diversion Spillways Install 270 SYD of Rip Rap or Heavy Rip Rap over non-woven geotextile fabric Includes all tree and stump removals, grading and fill, seeding and restoration, all storm sewer appurtenances, road ditching and channel grading, driveway paving and restoration, berms, driveway construction (fill), spillways, SESC, mobilization and various removals. Any responsible person wanting to bid on the above-mentioned work will be required to deposit bid security in the amount specified in the bidding documents (5%) as a guarantee that they will enter into a contract and furnish the required bonds as prescribed by the contract specifications and applicable law. All bids shall remain open for 90 days after the day of the bid opening, but I reserve the right at my sole discretion to release any bid and bid security before that date. The Drain Commissioner shall, within 90 days of receipt of bids, attempt to sell Bonds, Notes, or Drain Orders in an amount sufficient to pay for this project, it being understood that if the Drain Commissioner shall not have marketed Bonds, Notes, or Drain Orders in an amount sufficient to pay for this project within such 90 day period, a contract may not be executed. If, within such 90 day period, the Drain Commissioner shall successfully sell Bonds, Notes, or Drain Orders in an amount to pay for this project, the Drain Commissioner shall issue a Notice of Award to the successful Bidder after such sale, at which time the successful Bidder shall provide the necessary bonds and insurances required and execute the Agreement within fifteen (15) days from the Notice of Award. The bid of the successful Bidder and the Bond securing the same shall remain in full force and effect until the Notice of Award. If the Bonds, Notes, or Drain Orders herein before required to be sold are not marketed within the period provided above, or the Notice of Award is not given by the Drain Commissioner to the successful Bidder within the specified time, the bid may be deemed to be null and void and the bid deposit shall be returned to the successful Bidder. However, the 90 day period provided above for the sale of Bonds, Notes, or Drain Orders and the giving of the Notice to Award may be extended by mutual agreement between the successful bidder, the Surety Company issuing the bid bond for the successful Bidder, and the Drain Commissioner.
Post-Bid
Roads / Highways
$500,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 15, 2022
August 15, 2022
Multiple Locations, Suttons Bay, MI
Related To This Project
Suttons Bay, MI
Bid Date: Aug 11 2022
Suttons Bay, MI
Bid Date: Aug 23 2022
Suttons Bay, MI
--
Suttons Bay, MI
Bid Date: Mar 20 2023
Suttons Bay, MI
Bid Date: Apr 14 2023
Suttons Bay, MI
Bid Date: Jul 31 2023
Suttons Bay, MI
Bid Date: Feb 01 2022
Suttons Bay, MI
Bid Date: May 08 2023
Suttons Bay, MI
Bid Date: May 06 2022
Suttons Bay, MI
Bid Date: Jun 01 2022
Suttons Bay, MI
Bid Date: May 25 2022
Suttons Bay, MI
Bid Date: Apr 07 2022
Suttons Bay, MI
Bid Date: Apr 22 2022
Suttons Bay, MI
Bid Date: Dec 20 2022
Ada, MI
Bid Date: Aug 01 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.