Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Graeagle, California. Contact the soliciting agency for additional information.
Background: The Gold Stewardship IRSC shall be awarded under the following authority. Stewardship Authority: Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014--Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999. Project Location: All or Portions of T22N, R12E, Sections 21and 28, Mount Diablo Meridian. The Gold Stewardship IRSC is located on the Beckwourth Ranger District of the Plumas National Forest. ~1.5 miles southwest of the town of Graeagle, CA. To reach the contract area from the town of Graeagle, travel south on Highway 89 for ~1 miles. Turn west on Gold Lake Highway (PC519) towards The Lakes Basin Recreation Area. Subdivision will begin within approximately 2 miles on the north side of the county road, Description: The objectives of this project are to promote healthy, diverse, fire-resilient forests, improve water quality and improve conditions in the Wildland Urban Interface by performing the following work across 157 acres: Cut and remove green sawtimber (10.0 inches to 29.9 inches DBH). Cut, skid and deck green biomass (3.0 inches to 9.9 inches DBH) material. Chip and haul biomass material, including tops and limbs from sawlogs to a cogeneration plant or other disposal site. Perform temporary road construction. Recontour entrances from Plumas County Rd. 519 into the project area. Permanently close temporary road access and spread logging slash within landings for erosion control. Provide traffic control. Re-contour newly constructed bench skid trails if awarded Re-contour newly constructed temporary roads if awarded. The cost for Item 1 has been appraised for in the timber value; therefore, separate payment for this work will not be made. Estimated volume of sawtimber is 6,644 tons and the volume of biomass is 5,999 tons. Period of performance is from date of award through March 31, 2025. No organized site visit is planned but contractors are urged to site the visit prior to quote submission.
Post-Bid
Conservation and Development
Public - Federal
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 7, 2022
August 8, 2022
Multiple Locations, Graeagle, CA
Related To This Project
Graeagle, CA
Bid Date: Jul 12 2022
Graeagle, CA
Bid Date: May 17 2023
Graeagle, CA
Bid Date: Sep 27 2023
Graeagle, CA
Bid Date: Dec 04 2024
Sacramento, CA
Bid Date: Jul 07 2022
Ontario, CA
Bid Date: Feb 28 2022
Big Bear City, CA
--
San Diego, CA
Bid Date: Jul 07 2022
Sacramento, CA
Bid Date: Jul 06 2022
Irvine, CA
Bid Date: Jul 07 2022
San Diego, CA
Bid Date: Jul 07 2022
Elk Grove, CA
Bid Date: Aug 03 2023
Riverside, CA
Bid Date: Jul 07 2022
Woodland, CA
Bid Date: Jul 07 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.