Renovation of a water / sewer project in Wilson, Wisconsin. Working plans call for the renovation of a water / sewer project.

As of 08/15/2022 The bid came in over budget and project was put on hold, will rebid but there is no new schedule yet. **As of July 19, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Cth V Pump Station Improvements Town of Wilson Sanitary District no. 2 Owner. The Town of Wilson Sanitary District no. 2 (Sheboygan County, Wisconsin) (OWNER) is accepting sealed bids from qualified contractors to replace a magnetic flow meter. Description of Work. The following summarizes major work items: o Flow Meter and Equipment o remove existing inline magmeter and chart recorder o install a new inline magmeter and data recorder o 4" KROHNE enviromag magnetic flowmeter o 100 feet. DS cable (from meter to data recorder in existing conduit o Model LFC300 converter, wall mount bracket o hardware including but not limited to one (1) - 4" fla nged hymax coupling and two (2) - 4" sst flange connections o no substitutions or equals All work shall comply with the Wisconsin Standard Specifications for Sewer and Water Construction, recent edition. The successful bidder must furnish certificate of liability insurance and Workers Compensation insurance. Contracts will incorporate the District's Standards and General Terms and Conditions. The completion date of project will be negotiated at the time of contract award, but not later than October 15th, 2022. Contractor must substantially complete the work in five (5) consecutive calendar days. Bid Security. A satisfactory Bid Bond, payable to the Town of Wilson Sanitary District no. 2, in an amount not less than five (5%) percent of the bid. Legal Provisions. This contract letting shall be subject to the provisions of Wisconsin Statutes Section 60.47, 62.16(2)(d), and 779.15. The District reserves the right to reject any and all bids, cancel this solicitation, waive any informality associated with the bid process, and award the bid deemed most advantageous to the District. All bids shall remain in effect for not less than 60 days beyond the due date. by Order of Sanitary District no. 2 John Ehmann, President prepared by Strategic Municipal Services, Inc. (Plymouth)

Final Planning

Water / Sewer

$20,891.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
44
Bidding Soon
620
All Active Projects
246
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2022

February 15, 2023

img_map_placeholder

To Be Determined, Wilson, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.