BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 1, 2022 at 8:00 PM

Updated October 24, 2023

Site work and new construction of a transportation facility in Anchorage, Alaska. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.

The Municipality of Anchorage is an equal opportunity employer. Enclosed is pertinent information for use in preparing your proposal. Questions Due: 5:00 P.M. Local Time, June 23, 2022 For auxiliary aids, services, or special modifications to participate please contact the purchasing department to request reasonable accommodations at 907-343-4590; fax 907-343-4595; or wwpur@muni.Org The Municipality of Anchorage (MOA) is soliciting Request for Proposals (RFP) from interested, experienced and knowledgeable companies to provide Construction Manager/General Contractor (CM/GC) Services for the repair of twelve (12) separate buildings located on and around Merrill Field Airport, Anchorage, Alaska. Construction will begin in the 2022 season. This solicitation seeks a Construction Manager (CM) to participate in the design process as a member of a team with the Owner, Architect, and other project consultants. The CM will be included in the design process at approximately 35% design phase. The CM should be skilled in developing schedules (design and construction), work plans, preparing construction estimates, performing value engineering & life-cycle costing, analyzing alternative designs, understanding labor conditions, construction methods and techniques, performing constructability reviews and developing sequences of work. The CM must also be familiar with the local labor and subcontracting market and be capable of working with subcontractors to generate viable pricing alternatives. The selected company will establish a Guaranteed Maximum Price (GMP) for Construction. Upon successful negotiations with the Owner to meet the construction cost budget, the contract will be amended to include construction of the facility within the scope of work. The CM may or may not become the GC for construction services. Although the project will be delivered using the CM/GC delivery method, the MOA retains the right to use alternative delivery methods as necessary.

Award

Transportation Terminals

$46,896.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
3
Bidding Soon
155
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2022

November 11, 2022

Project location map

800 Merrill Field Dr, Anchorage, AK


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.