BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2022 at 8:00 PM

Updated September 15, 2023

Renovation of a detention facility in Connersville, Indiana. Completed plans call for the renovation of a detention facility.

The Work Consists of General Construction, Roofing, Civil Construction, Heating, Venting, Air Conditioning Construction, Plumbing Construction and Electrical Construction. All Work for the Complete Construction of the Project Shall Be Bid a Single Prime Contract With the Owner Based on Bids Received and Awarded. Bid Security in the Amount of Five Percent (5%) of the Bid Must Accompany Each Bid in Accordance With the Instruction to Bidders, Bid Security Shall Be a Certified Check or Bid Bond. All Certified Checks and Bid Bonds Shall Be Made Payable to Fayette County Commissioners. Fayette County Reserves the Right to Assign Any Portion of the Bid or Bids to a Holding Company. Bidders Shall Submit Their Employer Identification Number (E.i.n.) to the Owner on the Bid Form. In the Absence of an E.i.n., Bidder Must Submit Their Social Security Number. An Out-of-state Contractor and/or Subcontractor Will Be Obligated to Show Proof That They Are Registered With the Indiana Secretary of State to Conduct Business in the State of Indiana. The Successful Bidders Will Be Required to Furnish Contract Performance and Payment Bonds for 100% of Their Contract Amount Prior to Execution of Contracts. Bonds Shall Be Maintained in Accordance With Ic 36-1-12-13.1 and 36-1-12-14. Bonds Shall Be in Full Force and Effect for a Period of at Least Twelve (12) Months After the Date of Final Completion of the Contract. Should the Contractor's Bonding Company Give Notice of Cancellation; the Contractor Will Be Responsible for Securing New Bonds Prior to Termination. Representati V E S O F T H E O W N E R a N D Architect/engineer Will Be Present to Discuss Construction Sequence, Bidding Requirements and Information, Contractor Work and Storage Areas, and Requirements for Contractor's Personnel . The Owner Reserves the Right to Accept or Reject Any Bid and to Waive Any Irregularities in Bidding. No Bidder May Withdraw Their Bid for a Period of Sixty (60) Calender Days After the Date Set for Bid Opening.

Award

Jails / Prisons

$5,374,500.00

Public - County

Renovation

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
5
Bidding Soon
1,390
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2022

August 22, 2022

Project location map

307 N Central Ave, Connersville, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.