BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Brentwood, Missouri. Completed plans call for site work for a playground / park / athletic field.

Clarifications must be submitted to Navigate Building Solutions by 5 pm Thursday July 7, 2022, if needed an addendum will be issued on Friday July 8 addressing any last-minute questions / clarifications. The Scope of Work consists of Construction of a Destination Playground as outlined by the project documents (plans and specifications) to include, however are not limited to, the installation of storm water, electrical, IT and water utility lines; rough grading and compaction of on-site stored soils, pavilion structures (pavilion, entry gates and overlook structure as alternates), hardscape, concrete seat wall abutments, segmental retaining walls, installation of a water feature to include spray nozzles, controls and water feature systems, installation of playground equipment provided by owner, playground surfacing, amending of on-site soils and installation of planting soils, plantings and turf and meadows, irrigation system (providing and installation of a water recirculation and storage system for irrigation as alternate). The project is generally located east of the intersection of Brazeau Ave. and East Pendelton Ave. The City intends to award a contract on or about the week of July 18, 2022. Not less than the prevailing hourly rate of wages shall be paid to all workmen performing under this contract in this area according to the rates determined by the Department of Labor and Industrial Relations of the State of Missouri. The City reserves the right to accept or reject any bid and waive any irregularities in the best interest of the City. All questions about the meaning or intent of the Bidding Documents are to be submitted by email to the following person and should include in the subject line "Brentwood Park Destination Playground Project - Bid Question(s)". The questions shall include the specific area of work, the drawing page number and/or the specification section. This will help in the distribution of the questions to the appropriate designer as needed. Send Questions to: Brian Kunz Navigate Building Solutions Email: brian@navigatebuildingsolutions.com. Clarifications requested by the bidders must be received by Navigate Building Solutions by email not less than 5 days prior to receipt of bids. The reply will be in the form of an addendum, a copy of which will be forward to known bidders. SCI No. 2018-0318.14, 21136.01, 2126300, 22001192.00

Bid Results

Playgrounds / Parks / Athletic Fields

$4,256,000.00

Public - City

Site Work

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
37
Bidding Soon
784
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2022

September 15, 2022

img_map_placeholder

E pendelton Ave & Brazeau Ave, Brentwood, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.