BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Pleasant Prairie, Wisconsin. Working plans call for site work for a sidewalk / parking lot; water / sewer project; for paving for a sidewalk / parking lot; and water / sewer project.

As of October 31 2022 this project had all bids rejected. The abandonment and re connection of sanitary sewer force mains to an extension of a gravity sanitary sewer interceptor main. The work, in general, will include the approximate quantities and items listed below, ("*" indicates OWNER SUPPLIED MATERIALS, AS INDICATED WITHIN APPENDIX "A" OF THE PROJECT MANUAL): *733 LF 30" SDR 35 PVC Sanitary Sewer *51 VF 72" Dia. Sanitary Manhole *9 VF 60" Dia. Sanitary Manhole *57 LF 18" C900 Force Main *20 LF 30" C900 Force Main 1 EA Force Main Vault Discontinue In Place 1365 LF 18" Force Main Discontinue In Place 665 LF 30" Force Main Discontinue In Place *1 EA 8" Water Main Offset 76 LF Storm Sewer Abandonment - Removal 6.5 VF 48" Storm Manhole 57 LF 15" RCP Storm Sewer with AEW and Trash Grate 170 SY HMA Pavement Removal/Replacement 46 LF 36" Curb & Gutter Removal/Replacement 7 EA Tree Removal 8 EA Trees Lawn Restoration Traffic Control. Prequalification of Bidders is required. All Contractors shall comply with the "Contractor Qualification Ordinance of the Village of Pleasant Prairie" requiring pre-qualification of Contractors prior to performing work on this Contract. All Contractor pre-qualifications must be complete and submitted 5 days prior to bid opening date/time. Approved pre-qualifications will be posted prior to bid opening. All Subcontractors utilized for this Contract must be identified in the bid documents under "LIST OF SUBCONTRACTORS AND SUPPLIERS" and all Sub-contractors must be pre-qualified prior to award of this Contract. Applications for Qualification forms may be obtained from the Village of Pleasant Prairie Clerk at 9915 - 39th Avenue, Pleasant Prairie, Wisconsin 53158 or obtained from the following website:

Final Planning

Water / Sewer

$370,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

17

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
90
Bidding Soon
2,035
All Active Projects
858
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2022

August 31, 2023

img_map_placeholder

WI-165, Pleasant Prairie, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.