Site work and paving for a mixed-use development in Round Lake, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
All questions related to the Request for Qualifications must be submitted to Adam Wedoff via email (awedoff@roundlakeil.gov) by 12:00 PM, June 23, 2022 July 13, 2022 - Evaluation and short listing of top 3 firms July 15, 2022 - Firm selection and negotiations July 22, 2022 - Draft Agreement submitted to IDOT The Village of Round Lake invites Statements of Qualifications from IDOT prequalified engineering firms to assist the Village in completing Phase Ill Construction engineering services for the Wildspring Rd/Amarias Dr Street Improvements Project. The project is being funded with STP and local funding sources and will be administered through Illinois Department of Transportation (IDOT) and the Lake County Council of Mayors. The project must adhere to Village, Federal Highway Authority (FHWA) and IDOT standards as required. The construction limits along Wildspring Rd will be from Illinois Route 120 to Townline Road and the limits along Amarias Drive will be from Townline Road to Cedar Lake Road. The total project will include approximately 2.1 miles of asphalt resurfacing. Additionally there will be spot curb and gutter and sidewalk removal and replacement. Pre-final plans are available for review upon request. The Village expects that the project will be let on the September 2022 IDOT letting. Construction is anticipated to start in the early Spring of 2023 and be completed by the end of 2023. The Village expects that the project will be let on the September 2022 IDOT letting. Construction is anticipated to start in the early Spring of 2023 and be completed by the end of 2023. PROPOSAL CONTENTS All submittals must be thorough, complete and accurate. The .pdf submittal shall be a single .pdf document, no more than 20 pages in length (including cover letter, tabs, section breaks, resumes, conflict of interest, etc.). Tabs and section breaks are not required. The submittal should include the following information: 1. Cover letter on the firm's letterhead transmitting the qualifications. Include name of the firm, local address, telephone number and name of contact person (with email address). 2. Current IDOT prequalification status. The prime consultant must be prequalified in Special Services - Construction Inspection and submit documentation of their current prequalification status. 3. List of 3-5 relevant projects recently completed similar in nature to this project. Include a description of each project, including location, project team, and construction cost for each project. If the project was on an IDOT state letting, provide the letting date and item number and/or contract number. 4. A brief (maximum of 3 pages) technical approach regarding the firm's abilities to perform the required Phase III Engineering services. 5. List of key staff with brief resumes that would be assigned to the project including the Project Manager (must be a Licensed Professional Engineer in the State of Illinois), Resident Engineer (RE) (does not need to be a Professional Engineer) and any other relevant staff. Also, include any sub-consultants that will be required to complete the project, including the relevant prequalification categories for each sub-consultant (documentation of their prequalification status is NOT required). An organization chart is optional. 6. Conflict of Interest statement. 7. List of three (3) references including name, job title, telephone number, and email address. The references should not be current Village of Round Lake employees. The references should preferably have worked for a local agency on similar projects. The selected firm shall perform Phase Ill engineering services as required and in a professional and satisfactory manner. All work must be completed in accordance with the policies and standards of the Village, IDOT, and FHWA. The anticipated scope of services shall include but is not limited to the following: 1. Provide resident engineer and necessary construction inspection staff to ensure that improvements are completed in accordance with the approved contract plans and documents. 2. Attend IDOT Pre-construction meeting(s) with Village and IDOT. 3. Complete and maintain required reports, plan changes, anticipated cost changes, extra work, etc. Submittal of weekly reports to the Village, IDOT and the Contractor. 4. Facilitate progress meetings with the contractor and subs, utility companies, IDOT, and Village. Ensure that the contractor provides updated project schedule for progress meetings. 5. Coordinate with the Lake County Council of Mayors for any required reporting or updates including quarterly reports and close-out documents. 4 6. Coordinate with the Village on Public Relations items. 7. Maintain records during construction to document field changes. Prepare and provide as-built drawings (hard copy and electronic) to the Village. 8. Measure and document quantities meeting IDOT requirements. Prepare and submit various reports such as partial and final pay estimates, change orders, material reports, records, etc. 9. Provide and complete QA/QC material testing as required by IDOT. 10. Complete all final IDOT quantity and material documentation for Contract completion and close out. The selection criteria and weightings for project selection are as indicated below: 1. Technical Approach (20%). Project understanding and the entity's approach to perform Phase III Construction Engineering Services and related items that are required for successful project completion. 2. Firm Experience (30%). The entity's general experience, stability, and experience on projects similar to the one under consideration. Experience with federally funded projects is required. 3. Staff Capabilities (Prime/Sub) (30%). The education, experience, and expertise of the entity's key employees as they relate to the proposed scope of services. 4. Workload Capacity (10%). Present workload of key staff with attention to current and future commitments of the firm. 5. Specialized Expertise (10%). Entity's specialized expertise in relation to the project's scope of services. Firm experience with multiple federally funded construction projects administered through IDOT is a requirement. The technical approach should not include standard construction practices that apply to most projects and IDOT forms/documentation/procedures/etc. that are required on all federally funded projects. Instead, the approach should focus on any differentiators the firm and RE may have A selection committee comprised of staff from the Village will evaluate the submittals. The submittals will be reviewed, evaluated, and scored using the criteria and weights defined above. Submittals will be used by Village staff to select the three most qualified consultants to be the shortlisted firms. All consultants who submitted qualifications will be notified when the final selection is completed. Additional results and scoring breakdowns will not be provided. The top ranked firm will be notified and a final scope and hours will be negotiated. If an agreement cannot be reached with the top ranked firm, the Village will start negotiations with the next highest ranked firm. The engineering agreement format will be Cost plus Fixed Fee in accordance with IDOT requirements. The Method of Contractor Selection has not been determined at this time.
Conceptual
Roads / Highways
$700,000.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2023
S Wildspring Rd & S Amarias Dr, Round Lake, IL
Related To This Project
Round Lake, IL
Bid Date: Oct 03 2023
Round Lake, IL
Bid Date: Nov 09 2023
Round Lake, IL
Bid Date: Dec 06 2023
Round Lake, IL
Bid Date: Dec 19 2023
Round Lake, IL
Bid Date: Mar 10 2020
Round Lake, IL
--
Round Lake, IL
Bid Date: Mar 07 2024
Round Lake, IL
--
Round Lake, IL
Bid Date: Feb 16 2022
Round Lake, IL
Bid Date: Feb 03 2022
Round Lake, IL
Bid Date: Dec 14 2021
Round Lake, IL
Bid Date: Sep 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.