BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Doral, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The City of Doral desires to retain the services of a qualified and licensed Contractor, or a Certified Engineering Contractor to construct stormwater drainage improvements along NW 57th Street between NW 79th Avenue and NW 78th Avenue (Known as Phase I) and along NW 79th Avenue between NW 57th Street to NW 58th Street to construct along the NW 58th Street canal bank a 48" Outfall to discharge from the south bank of the NW 58th Street Canal (Known as Phase I). Roadway restoration and milling & resurfacing is required for this project. Also, canal bank improvements of pond 1 and pond 2 of NW 58th Street Canal to improve the top of bank of each canal segment to reach historical flood elevations. For a more detailed project overview refer to the attached construction plan set titled "Sub Basin H-5 NW 58th Street Canal and Outfall Improvements." All questions and/or comments should be directed to Procurement at the following email at procurement@cityofdoral.com. All inquiries must reference "ITB No. 2022-22 NW 58th Street Outfall" in the subject line. No phone calls will be accepted in reference to this ITB. Question Deadline 07/07/2022 at 5:00 PM ET Any communications regarding matters of clarification must be made in writing to the email address listed above. If it becomes necessary to provide additional clarifying data or information that revises any part of this ITB, supplements or revisions will be made available via written addendum. EAC Project No. 20067.LD01-04, CLIII 2021-0017, 17077.WW01-06 Phase I - 467,808 Phase II - 499,880

Bid Results

Water / Sewer

$1,433,501.00

Public - City

Paving, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
67
Bidding Soon
1,118
All Active Projects
442
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2022

August 28, 2022

img_map_placeholder

NW 58th St, Doral, FL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.