Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 12, 2022 at 8:00 PM
Updated September 14, 2023
Renovation of a clubhouse / community center in Pittsford, Vermont. Completed plans call for the renovation of a clubhouse / community center.
Town of Chittenden invites qualified electrical or general contractors to bid on exterior lighting for the Chittenden Grange Hall. The work includes complete installation of 4 town-owned poles with new RAB IVELOT fixtures to match the specs on the townowned units as directed, plus replacing the 2 yard-style fixtures on the building with new IVELOT style fixtures. Work must be completed before September 1, 2022. Bids must be accompanied by a Bid Bond or Bid Security in the amount of five percent (5%) of the base bid amount. The Owner will require a Performance Bond and a Labor and Material Payment Bond, or an Irrevocable Letter of Credit and proof of liability insurance. The Owner reserved the right to reject any or all bids and to accept informality and irregularity in the bids. Questions should be directed to Karen Webster, at (802) 483-6647 or by email: sbassistant@chittedenvt.org.
Post-Bid
Clubhouse / Community Centers
$100,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 11, 2022
August 10, 2022
3 Middle Rd, Pittsford, VT
Related To This Project
Pittsford, VT
Bid Date: Jun 18 2021
Pittsford, VT
Bid Date: Jun 22 2023
Pittsford, VT
Bid Date: Sep 01 2023
Pittsford, VT
Bid Date: Aug 30 2024
Pittsford, VT
Bid Date: Aug 01 2024
Pittsford, VT
Bid Date: Nov 25 2024
Pittsford, VT
Bid Date: May 12 2025
Pittsford, VT
Bid Date: Mar 18 2022
Alburgh, VT
Bid Date: Jun 02 2022
Essex Jct, VT
Bid Date: Jun 29 2022
Montpelier, VT
--
South Burlington, VT
--
South Burlington, VT
--
South Burlington, VT
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
