BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a military facility in Winnipeg, Manitoba. Completed plans call for the renovation of a military facility.

The work includes, but is not necessarily limited to, the supply of labour, material, supervision and equipment necessary to replace Eavestrough and Downspouts at various residential housing units located at CFHA 17 Wing Winnipeg, Winnipeg Manitoba. As per Acknowledgement Document, Item 7 - Bidders are advised that it is understood and agreed that in the event of their Tender being accepted within 30 (thirty) calendar days of the date and time stated for closing of tenders and their failing or refusing to carry out the contract in accordance with the terms of their Tender, their bid security, if required by the tender, (i) if in the form of a wire transfer, shall be forfeited to Her Majesty the Queen in Right of Canada, or (ii) if in the form of a Bid Bond, the Bonding Company shall be liable in accordance with the Bond. Bids from bidders whose name does not appear on the official list of bidders who ordered the tender documents, may be declared invalid. The Work must reach Substantial Completion no later than 451 calendar days after notification of contract award and must be completed no later than 7 calendar days after the date of Substantial Completion. (Refer to Amendment No. 1 for Completion milestone dates). Official bid documents must be obtained from www.merx.com

Award

Military

$243,915.00

Public - Federal

Renovation

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
42
Bidding Soon
534
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2022

August 12, 2022

Project location map

715 Wihuri Rd, Winnipeg, MB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.