BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Foley, Alabama. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a road / highway; and sidewalk / parking lot.

As of August 11, 2022, project was awarded to Asphalt Services, Inc., awarded amount is $1,070,310.50. This project consists of: Resurfacing, minor base repairs and minor drainage improvements for approximately 4.5 Miles of roadway and two parking lots; work includes approximately 6,562 Tons of Bituminous Concrete Wearing Layer and 300 Tons of Bituminous Concrete Binder/Patching Layer (including alternates) A total of Seventy-Five (75) calendar days will be allowed for completion of work. Prospective bidders may examine the Bidding Documents at this office Monday through Friday between 9:00 a.m. and 4:00 p.m. A pre-bid conference will be held in the City of Foley Council Chambers at 11:00 a.m. CST on Thursday, July 7, 2022. In the pre-bid conference, the city will review the scope of work and the desired result. To be eligible for consideration, bids must be submitted on complete original proposal forms found in the Invitation to Bid package. The specifications and all executed bid forms must be submitted in a sealed envelope, clearly marked, identifying the Contractor's license number, the Contractor's name and address, the bid name, and the date of the bid opening. It shall be the sole responsibility of the bidder to assure receipt of the bid at Foley City Hall prior to the published time for the bid opening. The envelopes must also be "Date and Time" stamped at the receptionist's desk when the bid packages are turned in. All Bidders must file with their bids either a cashier's check drawn on an Alabama bank or a bid bond executed by a surety company duly authorized and qualified to make bonds in the State of Alabama and made payable to the City of Foley in the amount of five (5%) percent of the Contractor's bid but in no event more than $10,000 and shall have a current State of Alabama General Contractors License. Furthermore, any Contractor that desires to bid as prime Contractor must have at least one of the following major classifications of license per Section 230-X-.27 of the State of Alabama Licensing Board for General Contractors Administrative Code: a) Highways and Streets b) Municipal and Utility c) Heavy and Rail Construction If awarded the bid and prior to beginning work, the Contractor is required to have a current City of Foley Business License, furnish a Certificate of General Liability Insurance and Workers Compensation Insurance, and proof of Automobile General Liability Insurance. Insurance Certificate provided to the City shall list the City of Foley as an additional insured. A performance bond and Payment Bond must be executed upon award of the bid with a penalty equal to one hundred (100%) percent of the amount of the contract price. If the successful bidder's award amount is $50,000.00 or greater, a background check will be performed per City of Foley Ordinance No. 1029-08, General Conditions, Section 1.14. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must provide evidence by including a copy of his or her current license in the sealed envelope in which the proposal is delivered. The City of Foley reserves the right to accept or reject any or all bids and to waive technical errors if, in the City's judgment, the best interests of the City will thereby be promoted.

Award

Roads / Highways

$1,070,311.00

Public - City

Paving, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
40
Bidding Soon
487
All Active Projects
195
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2022

August 15, 2022

img_map_placeholder

Multiple Locations, Foley, AL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.