BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Aberdeen, Washington. Conceptual plans call for site work for a road / highway; water / sewer project; and for paving for a road / highway.

Per the owner, as of March 30, 2023, a firm has been selected for this solicitation. The owner states that this solicitation is the environmental compliance phase of a project that will eventually be bid and constructed. A timeline for construction has not been determined. Closed solicitation has been included below for reference. ……………….. The Project is a multi modal project that uses the existing, dual-berth Terminal 4 and adjacent, Port owned uplands to improve cargo flow into and through the international shipping complex. The preliminary budget for the Project is $46.85 million. Critical construction elements of the Project include: construction of an additional 50,245 feet of rail for efficient unit train offloading, rail car storage, and unit train assembly; re-purposing a 50-acre brownfield into cargo lay down area for break bulk cargo yard relocation; construction of secured site access and roadway improvements for the safe, secure and efficient flow of vehicles into and through the site; and replacing marine terminal fendering system upgrades and related site improvements. Ag Processing, Inc. (AGP) recently approved a major expansion of its export facilities at the Port. The plans include the addition of a new state-of-the-art ship loader at Terminal 4 (the AGP Project). Terminal 4 is a deep-water berth with quick access to the open ocean. The AGP Project will enable AGP to load multiple ships up to and including Pana max-sized vessels. The Project will require State Environmental Policy Act (SEPA) review. A MARAD PIDP grant was applied for in May 2022, and if awarded the grant, a NEPA process will also be required following MARADs requirements. It is the Ports intent to begin an integrated SEPA-NEPA process this summer. Beginning with preparing a SEPA review and documentation and then utilize SEPA documentation for NEPA if awarded the PIDP grant. The SEPA/NEPA review of the Project may have to address the AGP Project. The method of contractor selection has not been determined at this time. Scope of Services: The selected consultant will provide professional services as needed to complete the project tasks. Specific tasks are anticipated to include: 1. Preparation of SEPA checklist and associated documentation 2.If applicable, preparation of NEPA checklist and associated documentation in accordance with MARAD requirements for the PIDP grant program 3.Preparation of environmental documentation for integrated SEPA-NEPA process to include sections covering the following plus any identified as necessary by the selected consultant: 1.Soil, geology, seismicity 2.Air quality (general conformity, climate change, and GHG) 3.Hazardous materials and waste management 4.Noise and Vibration o Climate Change and GHG Social Justice 5.Public Services and Utilities 6.Water Quality o Surface and Ground Waters 7.Wetlands and Waters of the US o Floodplains 8.Fish and Wildlife 9.T&E species and critical habitat 10.DOT Section 4(f) and parks/recreational resources 11.Cultural and Tribal resources 12.Environmental Justice o Traffic and safety 13.Land Use and visual impacts 4.Conduct appropriate coordination with the AGP Project 5.Lead management, coordination, and communications of the SEPA-NEPA process. Design and permitting of individual improvements will happen by separate procurement and contracts. However, the selected consultant may be tasked with the preparation, submittal, and coordination of certain permits for the Project. The Port encourages minority businesses, women’s business enterprises, and labor surplus area firms are encouraged to apply or to team with another firm. The method of contractor selection has not been determined at this time.

Conceptual

Water / Sewer

$46,850,000.00

Public - Federal

Paving, Site Work

11

15

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
40
Bidding Soon
903
All Active Projects
261
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 25, 2024

img_map_placeholder

To Be Determined, Aberdeen, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.