BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 24, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Cheyenne, Wyoming. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

As of August 24, 2022, project was awarded to Knife River, awarded amount is $145,468.25. The LCCC Greenway Connector Project involves new concrete sidewalk construction in the southwest area of the LCCC Campus in Cheyenne, WY. Improvements Include: Removal of concrete sidewalk. Installation of approximately 500 linear feet of concrete sidewalk. Installation of signage including rectangular flashing beacons. Installation of storm sewer culvert. Crosswalk and associated striping. Alternate #1: Speed Table : (Contract Bond, Inspections and Testing for Quality Control, Removal of Asphalt Pavement, Installation of Crushed Base Grading 'W" or Grading 'L', Concrete Pavement and Speed Table Marking as detailed on the Drawings. Credit for Standard Crosswalk Striping Included in Base Bid) Prequalify: Before responding to the bid, all bidders must prequalify after attending the pre-bid meeting. All questions must be submitted through Public Purchase. PLEASE submit each question individually. Questions due : July 7, 2022

Award

Sidewalks / Parking Lot

$145,468.00

Public - County

Paving, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
6
Bidding Soon
383
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2022

September 5, 2022

Project location map

1400 E College Dr, Cheyenne, WY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.