BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 20, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a water / sewer project in Palo Cedro, California. Completed plans call for the renovation of a water / sewer project.

The CSA #8 Palo Cedro Water Backup Generator Project is located at the end of Golftime Drive in Palo Cedro, CA. The project, in general, consists of providing all labor, materials, tools, transportation, disposal and insurance necessary to install a 125kW propane-fired generator to provide backup power for the well pump building and sewer lift station facility in the event of a utility power outage. Liquidated Damages: $1,000.00 Per Calendar Day Bid Bond Percentage: 10% Project Duration: 60 Work Days License Type Required: CA Class B or Combo of Classifications

Bid Results

Water / Sewer

$139,555.00

Public - County

Renovation

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
10
Bidding Soon
158
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.