EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 9, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Normal, Illinois. Working plans call for site work for a road / highway; and for paving for a road / highway.

The Town of Normal will receive sealed proposals for the following: 2023 Beech Street Pavement Replacement This project consists of approximately 450 CY of Removal of Unsuitable Material, 925 Ton of Subbase Granular Material, Ty. B, 2,700 SY of 8" PCC Pavement Removal and Replacement, 1,280 FT of Combination Concrete Curb & Gutter Removal and Replacement, 90 SY of Pavement Patching, 3 Each Inlet Frame & Grate Removal & Replacement and all other necessary items and incidentals required to complete this project according to the plans and specifications. Unless otherwise stated in the Invitation to Bid, each bidder must submit a Security Deposit with its Bid. The amount of the Security Deposit must be no less than 5% of the Bid amount. The Town of Normal reserves the right to reject any or all bids received. The bid award will be made by the Town Council and their decision will be final. This project consists of removing and replacing sections of pavement along Beech Street. This project includes PCC pavement removal and replacement, combination concrete curb & gutter removal and replacement, pavement patching, traffic control and other necessary work required to complete this project in accordance with the plans and specifications.

Final Planning

Roads / Highways

$550,360.00

Public - City

Paving, Site Work

29

4

4

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Lockers
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
60
Bidding Soon
620
All Active Projects
367
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2023

November 9, 2023

img_map_placeholder

Beech St, Normal, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Beech St Pavement Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.