BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Northbrook, Illinois. Conceptual plans call for the renovation of a fire / police facility; and municipal facility.

The Village remains committed to maintaining its public assets while building an operating service model that reflects the community's standards. The Village's Fire, Police, and Public Works departments each have significant facility improvement needs and, from an overall perspective, no longer meet the operational needs for their intended purpose, are not current with modern service delivery, and face many maintenance challenges. In 2016/2017, the Village Board's Ad Hoc Facilities Committee directed staff to conduct facility assessments for Fire Station 11, the Police Station and the Public Works Fleet Maintenance Garage. The Facilities Conditions Assessment and Report Card and a Facility Needs Assessment was completed by Healy Bender in March 2019. The process was put on hold as the Village considered options for its 1657 Shermer property and during the COVID-19 pandemic. While focusing on each department's public safety responsibilities and emphasizing sustainability, technology, community, and flexibility, the Village is prepared to move forward with next steps towards both long-term and short term facility improvements. At direction of the Committee of the Whole on November 9, 2021, costs proposed in FY 2022/2023 are intended to fund professional service expenses related to the completion of a revised Space Needs Assessment, Site Selection, and Schematic Design for each facility. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of June 30, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Fire / Police

$500,000.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
99
Bidding Soon
1,965
All Active Projects
844
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2023

img_map_placeholder

Multiple Locations, Northbrook, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.