BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Lincoln, New Brunswick. Completed plans call for the renovation of a educational facility.

* Award subject to final approval. The work under this Contract includes, but is not limited to the following: .1 Demolish and dispose of existing humidifiers h-1, h-2, existing natural gas piping down to boiler room, natural gas vent, intake and exhaust vents, humidity sensors, flow switches, humidity manifold in ahu-1, and steam distribution wand in ductwork from ahu-2. .2 Reuse existing steam lines, water lines, and drains. .3 Fill in holes left from removing combustion air intakes and vents. .4 Supply and install two new electric humidifiers in place of old units. connect to existing steam supply lines, and drain lines. .5 Replace existing flow switches and high limit duct humidistats in supply ductwork of ahu-1 and ahu-2 with new switches. .6 Install manufacturers short absorption manifold in ahu-1 in place of hm-1. install steam distribution wand in place of hm-2. supply and install new condensate drain line from distribution wand back to new h-2. .7 If new humidifiers are wall mounted units create a stand out of unistrut to support them. see humidifier stand detail. .8 Supply and install all additional piping required to connect humidifier to existing steam supply, domestic water supply, and drains for proper operation. .9 Integrate new humidifiers with existing sensors and building controls. coordinate with controls vendor advanced energy management ltd. .10 Supply and install new matching 200a 3 p breaker in panel 'ph'. .11 Supply and install new panel 'm1' in penthouse. see plan view penthouse - new. .12 Supply and install new 4c#250 mcm plus bond in 78mm emt from the new 200a 3p breaker in panel 'ph' to the new panel ''. route the conduit from electrical room into boiler room and up through floor into penthouse (adjacent to existing floor/conduit penetrations along wall near mcc), then on existing overhead strut support system to the new panel location. conduit run approximately 26 m (85 ft). .13 Supply and install new 60a non-fused disconnect for humidifier 1. .14 Supply and install new 100a non-fused disconnect for humidifier 2. .15 Supply and install new 4c#6 rw90 plus bond in 27mm emt from a 50a 3p breaker in panel 'm1' to the new 60a disconnect switch and from the new disconnect switch to the humdifier no.1. the final connection to the humdifier to be rw90 in liquid tight flex. .16 Supply and install new 4c#4 rw90 plus bond in 35mm emt from a 70a 3p breaker in panel 'm1' to the new 100a disconnect switch and from the new disconnect switch to humdifier no.2. the final connection to the humdifier to be rw90 in liquid tight flex. .17 Disconnect and remove electrical associated with existing humidifiers (h-1 and h-2). to include both 30 a disconnect switches, wire and conduit back to panel 'pd'. 15 a, 1p breakers (ccts 22 and 24) to remain as 'spare'. Documents are available through the Construction Association of NB.

Award

Educational

$62,789.00

Public - State/Provincial

Renovation

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
3
Bidding Soon
81
All Active Projects
34
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2022

August 19, 2022

img_map_placeholder

2475 NB-102, Lincoln, NB

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.