BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a transportation facility in El Cajon, California. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.

For Gillespie Field Vehicle Service Road to West Transient Ramp Project Contractors License Requirements: The Contractor shall possess, at the time the contract is awarded, a California contractors license, Classification A, General Engineering Contractor. DBE Project Goal: There is no DBE project goal established for this project. At this time, County of San Diego will meet the DBE goal on federally assisted projects through race neutral measures. County of San Diego supports the use of race neutral measures to facilitate participation by DBEs and other small businesses, and encourages prime contractors to subcontract portions of their work that they might otherwise perform with their own forces. Working Families Ordinance: Contractor shall comply, and shall ensure that its subcontractors at all levels comply, with the Working Families Ordinance set forth in Sections 73.10, et seq. of the San Diego County Administrative Code, which pertains to the payment of wages, utilization of a skilled and trained workforce, working conditions, and the provision of paid sick leave. Contractor shall post the Countys Working Families Ordinance notice (available upon request and at electronically ) in a conspicuous and accessible place in each location at which employees are employed, as required by the Working Families Ordinance. Contractor shall maintain records sufficient to document Contractors compliance with this section, including, if applicable, evidence of qualification for an exemption from the Working Families Ordinance, and shall provide such records to County upon request. Contractor hereby grants County permission to conduct an investigation regarding Contractors compliance with the Working Families Ordinance at any time, which investigation may include, but is not limited to, audit of documentation, inspection of the site of the work, and interviews of employees and/or workers. DVB Participation Requirements: In accordance with Board of Supervisors Policy B-39a: Public Works Procurements estimated (by the County) to exceed $1 million: the prime contractor shall meet or exceed 3% DVB Subcontractor Participation goal. Public Works Procurements estimated (by the County) to exceed $500,000 but not $1 million: the prime contractor shall make a good faith effort to meet or exceed a 3% DVB Subcontractor Participation goal. Public Works Procurements estimated (by the County) to be $500,000 or less, DVB Subcontractor Participation is encouraged, but not required. DVB participation may be documented on page 2-21a, but is not required at this estimate level. Countys Estimated Cost: This public works project is from $950,000 to $970,000 for Total Bid. Bid Security: In the form of cash, a certified or cashiers check, or a Bidders Bond executed by a corporation duly authorized to issue bonds in the State of California for at least ten percent of the bid amount shall accompany the bid. Performance and Payment Bonds: The successful bidder will be required to furnish a Performance Bond for one hundred percent and a Payment Bond for one hundred percent of the Contract amount. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Transportation Terminals

$970,000.00

Public - County

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
62
Bidding Soon
874
All Active Projects
392
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2022

August 15, 2022

img_map_placeholder

1960 Joe Crosson Dr, El Cajon, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.