BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 10, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a road / highway in Gallup, New Mexico. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of August 10th, 2022, project was awarded to H.O. Construction, Inc., with an awarded amount of $740,646.29. This project is for the improvements of the intersection of East Nizhoni Boulevard and College Drive. This project includes ADA pedestrian improvements with improved crosswalks, pedestrian signals, roadway surface, and traffic pavement markings. Miscellaneous items shall include utility improvements to the existing effluent and water lines. This includes the removal of existing tie-ins to the existing effluent line, new 12-inch pipe in the location of the existing 8-inch effluent line, and an extension of 8-inch PVC waterline on the existing waterline.

Award

Roads / Highways

$740,646.00

Public - City

Paving, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
8
Bidding Soon
88
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2022

September 19, 2022

Project location map

College Drive & E Nizhoni Boulevard, Gallup, NM


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.