BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Chicago Heights, Illinois. Completed plans call for the renovation of a military facility.

o Proposals are due on Jul 12, 2022 at 2:00 pm CST. Proposals will not be accepted after this time. o This acquisition is Set Aside for Total Small Business. o The estimated price range of this procurement is $8,000 to 22,000. o Please see 00401 SOW Door Replacement, no date, 31 pages o ALL BIDDERS ARE REQUIRED TO FILL IN ALL GOLD HIGHLIGHTED BLOCKS AND RETURN WITH THE PROPOSAL. o Proposals are due on Jul 12, 2022 at 2:00 pm CST. Proposals will not be accepted after this time. o This The contractor is responsible for furnishing all materials, equipment, labor, transportation, insurance, notifications, licenses, permits, fees and supervision necessary to replace and dispose of asbestos and lead painted door at Downer Grove VOR site in Chicago Heights, IL in accordance with the applicable statement of work and conditions of the contract. Electronic & IT: 03 is Set Aside for Total Small Business. o The estimated price range of this procurement is $8,000 to 22,000. o Please see 00401 SOW Door Replacement, no date, 31 pages o ALL BIDDERS ARE REQUIRED TO FILL IN ALL GOLD HIGHLIGHTED BLOCKS AND RETURN WITH THE PROPOSAL. Terms and Conditions List (a) The contractor is responsible for accomplishing all items of work in accordance with the applicable drawings, SOW and attachments. Additional labor, materials, equipment, and/or appurtenances not specifically detailed or specified, but required to complete the project, must be provided by the contractor as an integral part of the scope of work specified. All work performed and any materials and equipment used will be subject to approval by the Contracting Officer Representative (COR) and Contracting Officer (CO). This shall include but not be limited to testing, inspection, scheduling, reporting, and submittals. (b) Limit work to normal business working hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, unless otherwise indicated, amounting to a total of 40 hours/week. No work shall be scheduled or performed on Saturdays, Sundays, federal holidays, or during holiday maintenance moratorium periods, unless approved by the FAA in writing. Deviation from this work schedule may be discussed prior to the Notice to Proceed date during the Pre-Construction Conference. Additional changes/requests to agreed upon work schedule shall be submitted to the COR and forwarded to the CO for approval. All work beyond normal work hours shall be requested in writing to the COR 48 hours in advance. (c) The contractor must coordinate and report each day's work in advance with the Resident Engineer/COR. The contractor will not be allowed access to or to work at the site without the RE/COR on site to serve as an escort. (d) By submission of this offer, the offeror attests that all representations and certifications as reflected in the System for Award Management (SAM) are current and accurate as of the date the offer is submitted. The offeror shall provide immediate written notice to the Contracting Officer if at any time prior to award the offeror learns that any certification or representation in SAM was erroneous when this offer was submitted or has become erroneous by reason of changed circumstances. (e) Specific attention is invited to AMS paragraph 3.2.2.3.1.2.2, Communications with Offerors. The FAA may communicate with one or more Offerors at any time during the RFQ process. Communications with one Offeror do not necessitate communications with other Offerors, since communications will be Offeror- specific. Information determined to have common application and not considered prejudicial to Offerors will be communicated to all Offerors. (f) It is anticipated that price analysis will be based on adequate price competition; therefore, vendors are not required to submit cost or pricing data with its quote. However, if after receipt of offers it is determined that adequate price competition does not exist, uncertified, yet detailed, cost or pricing data may be required. (g) Inspection and Acceptance. The Contractor must only tender for acceptance those supplies or services that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or re-performance of nonconforming services at no increase in contract price. If repair, replacement or re-performance will not correct the defects or is not possible to correct the defects in a time period deemed reasonable by the Government, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights. (1) Within a reasonable time after the defect was discovered or should have been discovered; and (2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item. (h) The Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier. (see clause 3.10.1-20 in the QVL SIR 6973GH-20-R-00040 Amendment 1) SITE VISIT (CONSTRUCTION) (JUL 2004) (a) AMS clauses 3.2.2.3-42, Differing Site Conditions, and 3.2.2.3-43, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded under this SIR. Accordingly, FAA urges and expects offerors to inspect the site where the work will be performed. (b) Site visits may be arranged during normal duty hours by contacting: Name: Please contact Gay Joseph gay.j-ctr.joseph@faa.gov by 6 Jul 2022 if a site visit is needed for the proposal and include a list of attendees. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. complete it within _______3__0_______ calendar days

Post-Bid

Military

$22,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
97
Bidding Soon
1,783
All Active Projects
795
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2022

August 11, 2022

img_map_placeholder

To Be Determined, Chicago Heights, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.