BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 24, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a bridge / tunnel in Greenville, Michigan. Completed plans call for site work for a bridge / tunnel.

The City of Greenville will receive sealed bids for Bridge Rehabilitation work to replace deteriorated C-channel stringers on an 80-foot long pedestrian bridge over the Flat River. The work will also include pedestrian detour signing *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. The entire project shall be completed on or before the date given on the Bid Form, but no later than June 30, 2023

Award

Bridges / Tunnels

$12,688.00

Public - City

Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
122
Bidding Soon
1,331
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2022

August 25, 2022

Project location map

Fred Meijer Flat River Trail, Greenville, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.