Renovation of an educational facility in Geneva, Illinois. Completed plans call for the renovation of a educational facility.

The mechanical contractor will act as the project general contractor. Bids will not be accepted from firms other than mechanical contractors. The scope of work period includes providing all labor, materials, machinery, tools, equipment, and other means of construction necessary for completion of the work indicated in the Bid Documents including, but not necessarily limited to, the following: selective demolition, replacement of existing hot water boilers, hydronic accessories, thermal storage tank, and all related pumps, hydronic piping, plumbing piping, insulation, heat exchangers, exhaust fans, gas piping, air intakes, flues, ductwork, drains, air separators, expansion tanks, variable frequency drives, electrical power, building automation controls, cutting & patching of interior finishes, removal & reinstallation of doors & frames, concrete equipment curbs, cutting and patching concrete masonry, cutting and patching concrete slabs, and cutting and patching roof penetrations & flashings. The work site is Mill Creek Elementary School, N900 Brundige Road, Geneva, IL 60134. The on-site construction is scheduled to commence during next years 2023 summer break starting approximately on Tuesday, June 6, 2023, with a Substantial Completion date of Friday, August 4, 2023. Liquidated damages apply to the Substantial Completion date It is anticipated that the contracts will be awarded by the Board of Education at their regular meeting on Monday, August 15, 2022. Required prequalification documentation must be submitted in Adobe PDF format to the Districts Architect via the email address listed above on or before 4:00 p.m. Central Time on Wednesday, July 27, 2022. A Bidders failure to submit the required prequalification documentation will be considered grounds for rejection of the Contractors bid. Each bid must be accompanied by a bid security in the amount of ten percent (10%) of the Base Bid. The successful Bidder will be required to furnish construction performance and labor and material payment bonds in the full amount of the final Contract Sum. The Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1-12). The Contractor will be required to submit electronic copies of their certified payrolls with each application for payment using the Illinois Department of Labors Prevailing Wage Portal. The Geneva Community Unit School District 304 Board of Education reserves the right to accept or reject any or all bids, reject nonconforming bids, reject conditional bids, waive irregularities in the bidding procedures, or to accept any bid that, in its sole opinion, best serves the interests of the School District.

Award

Educational

$1,038,000.00

Public - City

Renovation

17

15

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer?s Field Services, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Site Remediation, Chemical Decontamination, Facility Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Siding, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Flooring, Terrazzo Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Common Motor Requirements for HVAC Equipment, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, Sequence of Operations for HVAC Controls, Facility Fuel Systems, Facility Fuel Piping, Facility Natural-Gas Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Heating Equipment, Breechings, Chimneys, and Stacks, Gas Vents
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Low-Voltage Controllers, Enclosed Controllers, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Process Equipment, Process Gas Pressure Regulators

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
162
Bidding Soon
2,320
All Active Projects
1,024
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2022

June 6, 2023

img_map_placeholder

N900 Brundige Rd, Geneva, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Boiler Replacement Project at Mill Creek Elementary School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.