BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 9, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Elephant Btte, New Mexico. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.

Contract Award Date: Jun 08, 2023 Contract Award Number: 6982AF23C000022 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: VAV4V3KEF6A4 Contractor Awarded Name: AUI INC. Contractor Awarded Address: Albuquerque, NM 87105 USA Base and All Options Value (Total Contract Value): $12,574,854.14 This is not a solicitation and plans and specifications are not available. PROJECT NUMBER: NM FLAP SIE 10(1) PROJECT NAME: LAKESHORE ROAD PROJECT DETAILS: The proposed Lakeshore Road project is needed to improve safety for motorists and pedestrians using Lakeshore Road and to enhance long-term public access to recreation areas located within Elephant Butte State Park and Elephant Butte Reservoir. The project is needed to improve drainageways that cross Lakeshore Road at four separate locations. This project will be constructing new box culverts and bridges to prevent significant roadway damage and closures during heavy rainfall. Lakeshore Road provides visitors with access to a variety of public areas located on the northern side of Elephant Butte Reservoir including general reservoir access. Improvements to the road would provide a safe and reliable access for vehicles, bicycles, and pedestrians traveling to Elephant Butte Reservoir. All the work is occurring in cultural and natural resource sensitive areas and there are numerous environmental constraints that will affect the construction schedule and type of operations. SCOPE OF THE WORK: The proposed project includes replacing the existing culverts at four separate locations (Site 1 through 4) along Lakeshore Road with new culverts or bridges. Site 1 at Hot Springs Landing, the proposed drainage improvements at this location will consist of replacing the existing culverts with double 10 ft wide x 5-ft-high x 144-ft-long concrete box culvert with riprap outlet for energy dissipation. The culvert will be placed at a skewed angle to adequately align with the existing drainage patterns. An approximately 1000-foot segment of Lakeshore Road will be resurfaced to accommodate two 11-footwide travel lands and 1-foot-wide shoulders with a graded ditch. Site 2 at Rock Canyon, the proposed drainage improvements at this location consist of replacing the culverts with double 10-ft-wide x 5-ft-high x 123-ft-long concrete box culverts with riprap outlet for energy dissipation. Site 3 - Long Point, improvements at this location will consist of shifting the alignment of Lakeshore Road to the west to improve sight distance and straighten the horizontal curvature of the roadway. An approximately 700 linear foot segment of Lakeshore Road would be reconstructed to the west of the existing Lakeshore Rd alignment to accommodate two 11-foot-wide travel lands and 1-foot-wide shoulders with a graded ditch. A new 70-ftlong span bridge would be constructed along the realigned segment of Lakeshore Road to convey the ephemeral drainage. Site 4 - Cedar Canyon, the proposed drainage improvements at this location will consist of replacing the existing 5 culverts with a 110-foot-long span bridge. The existing roadway embankment and 5 culvert structures would be obliterated and removed to accommodate the new bridge. PRINCIPAL WORK ITEMS: 19,200 Cubic yards of Roadway Excavation 2,055 Cubic yards of Structure Excavation 2,425 Tons of Asphalt Concrete Pavement 1,093 Cubic yards of Structural Concrete Class A (AE) 175,200 Pounds of Reinforcing steel. 74,900 Pounds of Reinforcing Steel Epoxy Coated. 600 Linear ft of Drill Shaft, 30-inch Diameter. LPSM payment for Construct and Maintain Diversion (construct and maintain, remove and restore for sites 1, 2 and 4) The anticipated advertisement date for the project is early April 2023 with construction anticipated from June 2023 to October 2024. The estimated price range is between $10,000,000 and $20,000,000. This will be solicited as a Full & Open competition. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$12,574,854.00

Public - Federal

Paving, Site Work

257

13

2

6

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
3
Bidding Soon
99
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2023

June 1, 2023

Project location map

Lakeshore Rd, Elephant Btte, NM


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.