BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 12, 2024 at 8:00 PM

Updated June 13, 2024

Site work and renovation of a civil project in Bunnell, Florida. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

**As of June 12, 2024 project was awarded but awarded amount is not available.** A. The Work to be performed under these Contract Documents consists of the construction of the Plantation Bay WWTF Phase II Improvements Project, inclusive of all equipment, materials and work required for a complete, tested and fully operational system. B. A general description of the work is provided below solely to assist the Contractor in preparing his Bid and does not purport to include all of the equipment, materials and work required for the Contract. The description includes but is not limited to the following: Provide labor, equipment and materials needed to install the electrical, instrumentation, yard piping and site work in support of the recently constructed 0.49 MGD dual train concrete, extended aeration facility (WWTF). The WWTF is located at 1600 Old Dixie Highway, Bunnell, FL 32110. This new plant replaces the existing steel ring treatment unit and is the second phase of the two phase WWTF improvements project. Phase I was completed while the system was owned by Flagler County. Phase II will be completed under a separate contract and is scheduled to be completed by September 2024. This project will incorporate many of the existing systems that were either installed or rehabilitated under the Phase I project or Phase II project. Some of these components include blowers, headworks, filters, electrical panels, generator, controls, etc. Also included in this Phase 3 Project is three additive alternates. The project includes the civil, mechanical, electrical and instrumentation required to complete the construction of the new extended aeration facility. The project also includes coordination with the precast, post tension concrete structure contractor as needed to test, startup and commission all equipment provided by said contractor. Submit bid RFIs to teresa.irby-butler@fgua.com. Bid Bond 5%

Award

Water / Sewer

$4,024,839.00

Public - State/Provincial

Renovation, Site Work

36

16

8

2

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
263
Active Projects
130
Bidding Soon
1,925
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2024

June 24, 2024

Project location map

1600 S Old Dixie Hwy, Bunnell, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.