BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Yelm, Washington. Completed plans call for the renovation of a water / sewer project.

This project shall consist of Schedule A - Liquid Process: Conversion of an existing Sequencing Batch Reactor (SBR,) water reclamation facility (WRF) to a new membrane bioreactor (MBR) WRY including all ancillary equipment needed to support the MBR, treatment system including but not limited to: Obtain and comply with permits; Partial demolition of SBR tanks, Blower equipment, pump station; Effluent Filters, lagoon equipment, power generators, chlorine contact. tank, Influent structure, Solids building equipment, and abandoning site pipe; Construction of Mechanical Electrical Building; MBE, tanks, Aeration tank walls, Headworks, Feed Forward Building, AMR CIP Building, Distribution structures, flow channels, Chemical Building, and Plant Drain Pump Station; Excavation, Paving and restoration; Supply and installation of headworks drum screens, gates and control panels; Supply and Installation of grit removal system with pump and classifier; Supply and installation of blowers; pumps, sanitary sewer piping, and supports; Supply and installation of MBE submerged membrane units (SMLTs) in MBR tanks; installation includes all piping, equipment and instruments provided by MBR manu-facturer; Stainless steel, ductile iron and other pipe supply and installation; Supply and installation of electrical MCCs, VFDs, instruments, duct banks, conduit, and PLC replacement; Supply and installation of standby generator with fuel tank and transform-er; Demolition and replacement of existing pipe, conduits; metal supports, and doors at the facility; Supply and. installation of HVAC systems and louvers. Schedule B - Solids Handling: Supply and install new centrifuge; polymer feed systems, controls, and conveyors: a biodryer constructed with expansion for second with up to three boilers, odor control, a 2,400-square foot weather enclosure, and ancillary equipment to produce an exceptional quality Class A Biosolid; and a new septage receiving station with screening, vii lying and metering, odor control; a storage tank, and pump station., Phase startup; temporary pipes/pumps and commissioning of facility equipment.; and other facility iinprovements and additions as shown on the Contract Draw ings. The Contractor shall substantially complete all work within 568 calendar days (Substantial Completion Date) and physically complete all work within 603 calendar days (Physical Completion Date). The bidder is urged to check the plans and contract provisions carefully.

Award

Water / Sewer

$32,998,602.00

Public - City

Renovation

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
75
Bidding Soon
1,870
All Active Projects
573
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 18, 2022

September 19, 2022

March 19, 2024

img_map_placeholder

931 Northern Pacific Rd SE, Yelm, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.