BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Orlando, Florida. Completed plans call for the renovation of a water / sewer project.

South Water Reclamation Facility North Plant Blower Building and WinCC Upgrade Question Submission Deadline January 22, 2024, 4:00pm 98016, 1555-0044 Questions concerning this solicitation shall be submitted via email to michelle.black@ocfl.net in accordance with the deadline for questions: Wednesday, July 20, 2022 at 5:00 pm EST. The Orange County Procurement Division operates under the leadership of Carrie Mathes, MPA, NIGP-CPP, CFCM, CPPO, CPPB as Procurement Division Manager and Chief Procurement Official in accordance with the Orange County Ordinance. This project includes installation of actuators for air valves to increase blower efficiency, and conversion to WinCC programming. This Contract is for execution of the SWRF North Blowers & HMI Upgrades Project, as shown on the Drawings and specified herein. The Work consists of furnishing all labor, equipment, and materials for the construction of the facilities consisting of, but not limited to the following: 1. Replacement of 17 existing butterfly valves with new butterfly valves and new electric valve actuators in the North Blower Building, plus replacement of one existing valve actuator on Blower #5 intake pipe with a new electric valve actuator, including furnishing all miscellaneous work and incidental items, as shown on the Drawings. 2. Installation of all electrical and SCADA system components to supply electrical power to the valve actuators and connect with the SRWF control and instrumentation network, including modifying PLC-03B program for automated blower starting /stopping. 3. Install a new switchboard and automatic transfer switch in the North Blower Building. 4. Modify existing MCC-USAA and MCC-USAB to feed new transfer switch. 5. Replace existing HMI servers with new server hardware. 6. Migrate existing iFix system to new WinCC system with new database and graphics. 7. Relocate server equipment to newly designated server room. 8. Install new UPS lighting panel in new server room for server circuits. 9. Modify PLC programs to accommodate new HMI graphics. 10. Testing of installed systems. 11. Restoration and clean-up. Question Submission Deadline January 22, 2024, 4:00pm

Bid Results

Water / Sewer

$6,232,700.00

Public - County

Renovation

30

23

28

5

Subscribe For Documents

78 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
99
Bidding Soon
1,465
All Active Projects
573
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

April 22, 2024

img_map_placeholder

4760 W Sand Lake Rd, Orlando, FL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.