BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Valley Springs, California. Working plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

**As of August 31, 2022, bid received were rejected as they were over the budget. Project will rebid but no definite date yet.** It is the intent of these specifications, terms, and conditions to describe the site improvements that the District desires to have completed at its Pardee Center facility. 1. Overview of Site Improvements* a. Clearing and grubbing. b. Site demolition. c. Grading d. Drainage improvements. e. Concrete flatwork. f. Mechanical equipment screens. g. CMU retaining wall with foundation and stone veneer and cap. h. Relocation of existing boulders. i. Irrigation system improvements including testing, startup procedures, training, and maintenance during establishment period. j. Planter edgings k. Plantings, (trees, shrubs, ground cover, and sod), including soil testing and preparation, pre-emergent herbicide, plant establishment period and planting guarantee. l. Rock, Cobble, and Mulch. * The above list is only intended to provide a basic overview of the type of work that this project entails. It is not intended to be all inclusive. Proposers should review the plans and specifications, as well as the existing site conditions to determine the full scope of work that is required. East Bay Municipal Utility District (District) intends to award a contract to the Proposer(s) who best meets the Districts requirements. Contractor Question Deadline. July 27th, 2022 Addendum Issued (if necessary)August 2nd, 2022 Anticipated Contract Start Date October 4, 2022 Contract Duration: 160 Calendar Days Proposer, Proposers principal, or Proposers staff shall have been regularly engaged in the business of providing site improvements for at least three (3) years.

Final Planning

Sidewalks / Parking Lot

$400,000.00

Public - County

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
70
Bidding Soon
1,391
All Active Projects
591
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2022

February 28, 2023

img_map_placeholder

3535 Sandretto Rd, Valley Springs, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.