Published July 8, 2022 at 8:00 PM

Updated September 14, 2023

Remodeling and renovation of a military facility in Silver Spring Township, Pennsylvania. Completed plans call for the remodel of a military facility.

Replace the existing roof with a new Ethylene Propylene Diene Monomer (EPDM) rubber roofing system including, but not limited to EPDM rubber roof membrane, protection board, insulation, flashing, etc. Existing roof has experienced wind damage to the south-western portion of the building along with leaks previously observed in the building will necessitate replacement of portions of the wood roof deck. During design, perform infrared and visual inspections of the existing roof (excluding monitors) to identify areas of potential decking damage. The Government will incorporate decking replacement via bid schedule unit prices as required by the infrared study. Total roof area is approximately 126,400 square feet. The roof replacement will include demo and installation of new flashing, metal trim, protection board, insulation, decking repairs, roof drains, and all other incidental work associated with providing for a complete and functional watertight roof system replacement. Drains, scuppers and downspouts are to be included in the project. Three (3) of the seven (7) existing building monitors shall be demolished. Provide new structural beams and purlins for a complete structural system to support roof and decking, flush with the adjacent roof elevation, at the former monitor locations (see illustration in Part 6 - Attachments). All building components requiring relocation due to the monitor demolition shall be relocated below the new decking elevation. These items include, but are not limited to, general lighting, fire suppression piping, electrical conduit, pipe/conduit/cable trays, support rods/hangers, and emergency lighting. New locations and installation shall comply with all applicable codes and standards. The remaining (4) existing building monitors will have the existing EIFS removed and insulated metal panels will be installed on the vertical exterior. The existing monitor roofs to be replaced with Ethylene Propylene Diene Monomer (EPDM) rubber roof which is included in the total roof area stated in the first paragraph above. New gutters, downspouts and splash blocks shall be included in the renovations of the existing monitors.

Post-Bid

Military

$300,000.00

Public - Federal

Remodeling, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
374
Active Projects
194
Bidding Soon
2,186
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2022

August 29, 2022

Project location map

To Be Determined, Silver Spring Township, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.