BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 21, 2022 at 8:00 PM

Updated September 15, 2023

Renovation of a water / sewer project in Texas City, Texas. Completed plans call for the renovation of a water / sewer project.

GCWA is investigating the use of automatic valve closure systems to provide added safety to the chlorine gas system. The Thomas Mackey water treatment plant utilizes (1) ton chlorine gas containers as part of the disinfection process. Automatic valve closure systems are actuators that mount directly onto the cylinder valve stem system. An automatic valve closure system is designed to provide 40 - 50 ft-lb of closing torque to the valve stem upon receipt of an emergency shutdown signal, stopping any leakage that may be occurring. The shutdown system is requested as an additional line of defense to an approved safety plan. It automatically shuts the primary isolation valves on the containers if a detectable gaseous chlorine leak is detected. The actuator mounts on the cylinder valve stem by means of a drive bushing and two parallel rods that straddle the gas valve nozzle making it easy to remove during cylinder changes. The actuator is designed to apply 40 ft-lb of closing torque to the valve stem after receiving an emergency shut down signal from any number of sources such as a chlorine gas detector. The actuator is designed as an emergency closure device and therefore is powered only in the closing direction. At the TMWTP, the actuators shall be installed on each of the one (1) ton chlorine gas cylinders designed for automatic closure of the valve. The actuator shall be tied into the chlorine gas detector installed within the chlorine gas building as well as the Emergency Shutdown Button and plant SCADA. In addition, Plant operators will utilize the actuators to close the valves during change out of the cylinders. Actuators shall be attached to the stem with the appropriate torque specs. The actuators shall be tested when installed on the new cylinders, which ensures that the actuators are operating according to design specification. The chlorine shut-off device protects the plant with associated chlorine system and equipment from accelerated corrosion caused by chlorine gas escape while the installation is unmanned. It also supplements and enhances the protection of operating personnel against exposure to chlorine gas.

Award

Water / Sewer

$243,300.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
373
Active Projects
216
Bidding Soon
3,110
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2022

August 25, 2022

Project location map

4001 5th Ave N, Texas City, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.